Total installed capacity 28 MW in cascade (6MW, 8MW and 14MW) 6km pressure pipe for each unit in cascade for a total of 18 Km and a 0.3 Km tunnel for the 14MW hydro plant Capacity factor 69.3% Expected yearly production 176.7 GWh Hydrology studied over 124 years Project data reviewed and verified by POYRY Studies available upon request for detailed due diligence (an executed NDA is required) Expected returns 16.7 %IRR Renewable PPA for 15 years TOTAL EST. COST USD 53.2 Million (EPC estimated cost: USD 47 Million) Construction period 18 months