Location Near Lima (see map) Installed capacity 6.5 MW Tunnel 1.4 Kms / Channel length 0.5 Km Capacity factor 64.7% Expected yearly production 50.7 GWh Hydrology studied over 36 years Project data reviewed and verified by Lombardi SPA Studies available upon request for detailed due diligence (an executed NDA is required) Expected returns 17.7 %IRR Renewable PPA for 15 years TOTAL EST. COST USD 12.4 Million (EPC estimated cost USD 11 Million) Construction period 15 months