InvestorsHub Logo
Followers 9
Posts 530
Boards Moderated 0
Alias Born 07/23/2012

Re: gitreal post# 153297

Saturday, 05/30/2015 2:16:18 PM

Saturday, May 30, 2015 2:16:18 PM

Post# of 173216
I was referring to the cost of a vegetation study per drill hole site which is 2500 dollars per vegetation study. The cost of actual drilling in the ground is much much higher and needs funding.

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent LBSR News