InvestorsHub Logo
Followers 15
Posts 1663
Boards Moderated 0
Alias Born 12/04/2014

Re: surfkast post# 23842

Friday, 03/27/2015 4:53:52 PM

Friday, March 27, 2015 4:53:52 PM

Post# of 98650
Fairfield Facility where the new Line is being installed. The piston can filling machine is to be installed on April 25 things are on schedule. As soon at it is installed with a little tweaking she will be up and running. Did not talk to
Wade about the private labeling. But he was open and we talked over 20 minutes He answered every question I asked bar none.
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent NHMD News