Monday, November 10, 2014 9:15:01 AM
http://www.dsireusa.org/incentives/incentive.cfm?Incentive_Code=MA122F&re=1&ee=0
http://www.dsireusa.org/incentives/incentive.cfm?Incentive_Code=MA122F&re=1&ee=0
Commonwealth Solar Hot Water Commercial Program
Last DSIRE Review: 10/31/2014
Program Overview:
State: Massachusetts
Incentive Type: State Rebate Program
Eligible Renewable/Other Technologies: Solar Water Heat
Applicable Sectors: Commercial, Industrial, Nonprofit, Schools, Local Government, State Government, Tribal Government, Fed. Government, Multi-Family Residential, Low-Income Residential, Agricultural, Institutional
Amount: Feasibility study: $5,000;
Construction grants: $75*number of collectors*SRCC Rating (Private); $150*number of collectors*SRCC Rating (Public/Non-Profit)
Massachusetts Manufactured adder: $200
Metering adder: Up to $1,500
PV adder: $500
Maximum Incentive: Feasibility study: $5,000
Construction Rebates: 40% system costs or $100,000 (Private); 65% system costs or $100,000 (Public/Non-Profit)
Equipment Requirements: Must be new, OG-100 and OG-300 certified, 10 year warranty (collectors), 2 year warranty (other system components)
Installation Requirements: Must be installed where the collectors will receive at least 5 hours of sunlight a day (75% shade-free).
Funding Source: Massachusetts Renewable Energy Trust Fund
Program Budget: 2011-2012: $1,000,000; 2012-2016: $10,000,000
Start Date: 08/04/2011
Expiration Date: 12/31/2016
Web Site: http://www.masscec.com/programs/commonwealth-solar-hot-water
Summary:
Feasibility Study Grants
Beginning in August 2011, the Massachusetts Clean Energy Center (MassCEC) will provide grants* for feasibility studies of commercial solar hot water systems through the Commonwealth Solar Hot Water Commercial Pilot Program. Commonwealth Solar Hot Water Commercial grants are available to electricity customers served by the following Massachusetts investor-owned electric utilities: Fitchburg Gas and Electric Light (Unitil), National Grid, NSTAR Electric and Western Massachusetts Electric. In addition, customers of certain municipal lighting plant (MLP) including Ashburnham, Templeton, Holden, Holyoke and Russell utilities are eligible. Only entities that live in territories that contribute to the MassCEC Renewable Energy Trust Fund are eligible for the grant.
Up to $5,000 is available for private entities, with a cost-share of at least 25%. The cap for public entities is also $5,000 but the cost-share requirement is only 5%. To be eligible, building owners must hire an experienced consultant to do the feasibility work. The project location must be appropriate and must have enough sun and the building must have year-round hot water needs. The application must also demonstrate that the time frame and budget required for the feasibility study are "reasonable." The consultant completes and submits the application and supporting documentation (such as aerial photos, copies of electric bills) on the building owner's behalf. All projects must be approved before feasibility study work begins.
It should be noted that a feasibility study is required to be eligible for construction grants.
Construction Grants
The same eligibility requirements apply to construction grants as feasibilty study grants. Systems may be installed regardless of the source of back-up heating (not restricted to just electricity back-up). Third-party ownership is permitted. Rebates are calculated by multiplying $75 by the number of collectors and by the SRCC rating (for commercial installations, public installations are eligible for $150 multiplied by the collectors and the SRCC rating). There are adders available for components manufactured in Massachusetts, systems owners who participate in the MassCEC performance monitoring program, and system owners who have installed a solar PV system by the time of their application.
Applications are completed online by the installer. Pre-approval is required and the installation must occur within 9 months of receiving approval. MassCEC may inspect any system after it is installed.
* Although the Massachusetts Clean Energy Center calls these "grants," these incentives are first-come, first-served and are non-competitive as long as all the eligibility criteria are met. Therefore, it falls under the categorization of "rebate" according to DSIRE methodology.
Contact:
Information - Commonwealth Solar Hot Water
Massachusetts Clean Energy Center
55 Summer Street, 9th Floor
Boston, MA 02110
E-Mail: solarhotwater@masscec.com
Web Site: http://www.masscec.com/solarhotwater
looks like Jon Ricker's timing is perfect.
Recent MMMW News
- Form 8-K - Current report • Edgar (US Regulatory) • 05/15/2024 03:44:27 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 05/08/2024 12:10:37 PM
- Mass Megawatts Announces Several New Product Lines with Lowest and Competitive Prices as a Source of Generating Revenue in this Fiscal Quarter and to Help Market our Patent Pending Solar Tracker • InvestorsHub NewsWire • 02/22/2024 01:00:00 PM
- Form DEFA14A - Additional definitive proxy soliciting materials and Rule 14(a)(12) material • Edgar (US Regulatory) • 02/12/2024 11:01:42 AM
- Form DEF 14A - Other definitive proxy statements • Edgar (US Regulatory) • 02/09/2024 06:02:22 PM
- Form PRE 14A - Other preliminary proxy statements • Edgar (US Regulatory) • 01/26/2024 10:03:45 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 01/26/2024 09:20:13 PM
- Form 10-Q - Quarterly report [Sections 13 or 15(d)] • Edgar (US Regulatory) • 12/06/2023 05:30:56 PM
- Mass Megawatts Announces LOWEST PRICE GUARANTEE on Solar Project Sales and Further Cost Reductions Using our Patent Pending Technologies • InvestorsHub NewsWire • 11/28/2023 01:00:00 PM
- Form 10-Q - Quarterly report [Sections 13 or 15(d)] • Edgar (US Regulatory) • 09/08/2023 05:05:04 PM
- Mass Megawatts Announces Improvements Bringing Potential Project Payback Within 3 Years Using the Cost Cutting New Patent Pending Concentrated Solar Power Sterling Engine Technology • InvestorsHub NewsWire • 09/06/2023 11:45:37 AM
- Mass Megawatts Announces Improvement to Increase Power Output of an Additional Twenty Percent to the Recently Announced Innovations. Company Seeking UL 3703 Certification of Solar Trackers for Turbocharging Sales • InvestorsHub NewsWire • 08/23/2023 11:32:40 AM
- Mass Megawatts Generated Five Planned Solar Project Sales During August • InvestorsHub NewsWire • 08/11/2023 11:26:20 AM
- Mass Megawatts Plans to Build a Small Community Solar Project With its Newest Technology • InvestorsHub NewsWire • 08/07/2023 12:55:13 PM
- Form 10-K - Annual report [Section 13 and 15(d), not S-K Item 405] • Edgar (US Regulatory) • 07/25/2023 08:21:47 PM
- Form QUALIF - Notice of Qualification [Regulation A] • Edgar (US Regulatory) • 07/24/2023 04:15:07 AM
- Form 1-A POS - • Edgar (US Regulatory) • 07/19/2023 07:13:54 PM
- Form 1-A POS - • Edgar (US Regulatory) • 07/19/2023 05:25:55 PM
- Mass Megawatts Plans to Apply for OTCQB Status • InvestorsHub NewsWire • 07/12/2023 11:30:00 AM
- Form 1-A POS - • Edgar (US Regulatory) • 07/11/2023 08:38:29 PM
- New Solar Technology To Boost Energy Production • AllPennyStocks.com • 06/29/2023 02:30:00 PM
- Mass Megawatts Announces a New Solar-Power Technology that Boosts Energy Production by More Than 170% • InvestorsHub NewsWire • 06/29/2023 11:40:00 AM
ECGI Holdings Announces LOI to Acquire Pacific Saddlery to Capitalize on $12.72 Billion Market Potential • ECGI • Jun 13, 2024 9:50 AM
Fifty 1 Labs, Inc. Announces Major Strategic Advancements and Shareholder Updates • CAFI • Jun 13, 2024 8:45 AM
Snakes & Lattes Opens Pop-Up Location at The Wellington Market in Toronto: A New Destination for Fun and Games - Thanks 'The Well', PepsiCo, Indie Pale House & All Sponsors & Partners for Their Commitment & Assistance Throughout The Process • FUNN • Jun 13, 2024 8:18 AM
HealthLynked Introduces Innovative Online Medical Record Request Form Using DocuSign • HLYK • Jun 12, 2024 8:00 AM
Ubiquitech Software Corp (OTC:UBQU) Posts $624,585 Quarterly Revenue - Largest Quarter Since 2018 • UBQU • Jun 11, 2024 10:13 AM
Element79 Gold Corp Files for OTCQB Uplisting, Provides Financial Update • ELEM • Jun 11, 2024 9:25 AM