9/4/14:RECEIVED LETTER FROM RICHARD HEDDLE - JBI THAT DECOMMISSIONING OF ABOVE GROUND TANKS: ES-5, ES-6 & ES-7 HAS COMMENCED.

10/2/14:SAC INSPECT SITE. MET W/ED MALKIEWICZ - JBI. CONTAINMENT DIKES HAVE BEEN REMOVED ALONG WITH ANY CONTAMINATED SOIL. MR. MALKIEWICZ SAID WORST AREA WAS UNDER THE SOUTHEAST CORNER OF THE PLASTIC WHICH IS PROBABLY CONTAMINATION CAUSED BY PRODUCT FROM SPILL NUMBER 1400991 WHICH WENT UNDER THE CONTAINMENT. SAND WAS FOUND AROUND TANKS. MR. MALKIEWICZ SAID SAND WAS PLACED DOWN UNDER THE PLASTIC WHEN CONTAINMENT WAS INSTALLED. ALL 3 ASTs REMAIN IN PLACE. THERE IS STILL PLASTIC UNDERNEATH THE ASTS. WATER AND PRODUCT WAS OBSERVED ON THE REMAINING PLASTIC FOR AT LEAST ONE OF THE TANKS. CONTAMINATED MATERIAL WAS PLACED IN TOTES AND IS STILL ON-SITE INSIDE ONE OF THE BUILDINGS. MR. MALKIEWICZ SAID HE DOES NOT KNOW OF ANY SCHEDULED WORK TO CLEAN AND CLOSE THE TANKS, AT PRESENT.

10/28/14:RECEIVED COPY OF LETTER FROM TERRI MUCHA - DEC OGC TO RICHARD HEDDLE REQUESTING UPDATE ON WORK REQUIRED IN STIPULATION. MS. MUCHA REQUESTED RESPONSE BY 11/14/14.

*5 and 10 year permits issued by NYSDEC*