InvestorsHub Logo
Followers 822
Posts 163172
Boards Moderated 6
Alias Born 09/23/2009

Re: None

Monday, 10/27/2014 1:36:15 PM

Monday, October 27, 2014 1:36:15 PM

Post# of 2460
The Phase 1 project included a complete pre-field verification at the Santa Ana College Campus, a construction grade audit, and a review of proposed lighting layouts. Sun also assisted in fine tuning the exterior lighting specification during the construction phase. Inefficient (400-1000 Watt) HID parking lot and walkway fixtures were replaced with new (225-295 Watt) LED fixtures. New (40 Watt) LED canopy fixtures were installed in exterior walkways of a multilevel instructional building. A variety of interior T8 fluorescent fixtures throughout the entire campus were retrofit with high efficiency LED retrofit kits
ECOP

Join the InvestorsHub Community

Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.