As of October 24, 2014, JV002 is waiting for Proof of Product (POP) from the Supplier that the jet fuel has arrived at Rotterdam and unloaded in a jet fuel storage tank. The following documents are required:
1. Tank Storage Receipt (TSR); 2. Authorization To Sell (ATS); 3. Dip Test Authorization (DTA); and 4. Fresh SGS report, not less than 48 hours.