InvestorsHub Logo
Followers 48
Posts 2016
Boards Moderated 0
Alias Born 02/14/2009

Re: None

Saturday, 10/18/2014 10:33:44 AM

Saturday, October 18, 2014 10:33:44 AM

Post# of 278319
Bananarama

My DD has come up with MS still had the problem of variability between individual fiber filaments.
However the New Testing Advancements to Improve Spider Silk Material Quality and Reduce Variability will eliminate this issue.
As Per Press Release on July 30

Since KBLB is eliminating several of the silk worms that may have variations this is the reason for the delay in MS Metric Ton Production.

Here is a web site that Ben has sent me that explains the process and the time line for production of MS Silk

Quote from Ben
. Although this link
http://www.designboom.com/history/silk1.html
state 20-24, I think that it's more reasonable to double that, because there are several steps that they did not factor into the equation.



However I now do believe that at this point with the new Quality control measures we are close to metric ton production capabilities for MS

Bananarama you are right that this quiet period is about to end very soon and I would not want to out of this stock. As Spillmonkey has said their are many HUGH PR'S of Corporate activity that will move this stock BIG TIME coming.

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent KBLB News