InvestorsHub Logo
Followers 19
Posts 705
Boards Moderated 0
Alias Born 07/11/2013

Re: ZRock post# 25130

Wednesday, 10/15/2014 6:50:49 AM

Wednesday, October 15, 2014 6:50:49 AM

Post# of 81999
Yep..Z..I have seen what it is like to build a factory. Incidentally, GE was the biggest customer at the time the building stage. We have all the metal parts of the quality assurance takes a lot of time. Material inspection is slow and after manufacturing defect is discovered at the time, so it is really expensive. Error-free production is effective. The narrower the production of the material flow is, the more likely keep the quality to be good. I understand a lot of factory production, which are made of top quality technology. I understand the assembly, logistics, cnc machining, heat treatment and testing. And if the quality is poor after heat treatment, and it can not be repaired, so it costs about 20 to 150,000 euros. I do not know, but whether Sigma IPQA very valid as a heat-treatment devices. If it is, the holy bang .. I'm going to figure this out.
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent SASI News