Thursday, April 06, 2006 9:42:02 AM
Work at the mine continues with development of access to the strike and preparation of a temporary refuge chamber in accordance with MSHA requirements. Crews are extending utilities and expanding the infrastructure in order to support the bulk sampling to follow. The existing fabric air ducting which brings ambient air to the workings is being replaced with steel piping, which will reduce line loss and increase air flow to the miners and their diesel equipment. Electrical power and high pressure air is being upgraded as well. Crews are blasting and drifting toward the footwall in order to eventually establish the draw points and scrams. Mineralized material is being encountered in this process, and samples, such as the one above, continue to indicate positive showings for molybdenite along the North Zone.
The "whole rock assay" performed on the sample represented by the slabs in the photo (below) ran 5.35% for the competent vein material (marbleized pieces at top of photo) and 2.94% for the clay component (larger bottom piece).
http://www.golden-phoenix.com/
Avant Technologies Engages Wired4Tech to Evaluate the Performance of Next Generation AI Server Technology • AVAI • May 23, 2024 8:00 AM
Branded Legacy, Inc. Unveils Collaboration with Celebrity Tattoo Artist Kat Tat for New Tattoo Aftercare Product • BLEG • May 22, 2024 8:30 AM
"Defo's Morning Briefing" Set to Debut for "GreenliteTV" • GRNL • May 21, 2024 2:28 PM
North Bay Resources Announces 50/50 JV at Fran Gold Project, British Columbia; Initiates NI 43-101 Resources Estimate and Bulk Sample • NBRI • May 21, 2024 9:07 AM
Greenlite Ventures Inks Deal to Acquire No Limit Technology • GRNL • May 17, 2024 3:00 PM
Music Licensing, Inc. (OTC: SONG) Subsidiary Pro Music Rights Secures Final Judgment of $114,081.30 USD, Demonstrating Strength of Licensing Agreements • SONGD • May 17, 2024 11:00 AM