LEAP production pressure is building. They need these parts working perfectly from the beginning. Wonder how they're going to make sure they're produced with quality standards being met? wink

"The first Leap-1C engine has in the meantime been transported to Victorville where it will be attached to the first of GE’s two 747 flying testbeds with the aim of starting flight tests in early September. The first -1A, which is due to arrive in California about a month later, will be installed on GE’s more recently acquired 747-400 testbed. The two engines will then be tested side-by-side for several months from the fourth quarter onward, marking the first time GE’s flight-test unit has undertaken such an intensive evaluation period."

"We are in the final stages of build of the next –1B engine, which goes to test in the September-October period."

http://m.aviationweek.com/commercial-aviation/first-leap-1as-a320neo-enter-production