Concerned Long - was doing some math around their 50,000 ton a year contract with ECEM. Agri Tech is building them a smaller version of their Torre-Tech 5.0 machine (http://www.agri-techproducers.com/default.html) "Joseph J. James, President of Agri-Tech Producers, LLC(ATP), is pleased to announce that ATP is helping one of its operating affiliates in opening a pilot torrefaction plant in Allendale, South Carolina, in early 2015. ATP, with the help of its equipment manufacturing partner, the Kusters Zima Corporation, is in the process of manufacturing a smaller version of its standard machine, for the pilot plant."

There 5.0 machine produces 5 ton per hour (http://www.agri-techproducers.com/upload/New%20Torre-Tech%205.0%20Spec%20Sheet%20Corrected.pdf).

Running 24 hours a day for 365 days a year (which it will not do) it would generate 43,800 ton in one year.

This would not allow them to meet this contract or allow for any additional contract to be filled.

What am I missing here.

VGPR long (for now)