Follow that timeline.
There will be a contract from them eventually.

January 2014 –
Pro2Serve is making arrangements to send Oak Ridge soil samples to J3 Advanced Engineering Technologies, Inc. for initial landfill type treatability tests using ORNL soil spiked with mercury and uranium.
March 2014 –
Soil samples and initial landfill design sent to J3 Advanced Engineering Technologies, Inc. in Butte, Montana. Test apparatus design has been initiated.

http://www.j3aet.com/uploads/Oak_Ridge_Mercury_timeline.pdf