Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
One month predictions?
I'm about to lose control and I like it!
Me too, that is unbelievably great news and it tells me they know they have a stock that should and will be higher.
I threw it out there to see if everyone was paying attention. :)
Lots of good things going on behind the scenes.
Holders of ADAC are excited and we have reason to be.
bigcat, because of the dividend and other things going on.
Because of the looming dividend.
Hello Bernija! Congrats, we will sail from here.
If you are reading this now, you have a terrific opportunity. Think about picking shares of ADAC up now.
It always works that way.
lol, hilarious!
You'd be the Boss.
A Few Past Projects East Providence RI
The MBS technology was used effectively on-site to treat lead contaminated soils on the former Ocean State Steel Plant in East Providence, RI which ultimately received the “Brownfield's Project of the Year” award for 2004 from the Environmental Business Council of New England. On December 5, 2003 the City Council of East Providence, RI announced the formal groundbreaking for the East Point Development project. The groundbreaking ceremony was tagged as the “first step in the rebirth of the East Providence Waterfront.”
The site remediation began on Friday, December 19, 2003 and was completed in February 2005. Once the Rhode Island Department of Environmental Management (RIDEM) completes its review of the site, a closure report will be issued that allows the site to be redeveloped. The proposal to the city outlined a development for this remediated land of a New England-style village with 35 single-family houses, 40 town homes, 70 row houses and 294-mutiple family dwellings. The agreement with HUD (Housing Urban Development) also requires 75,000 square ft. of commercial space for such things as restaurants, shops, a marina, offices, etc., employing at least 108 people. All of the components of the clean up and redevelopment must be completed by 2008. Based on the estimated cost range of $200,000,000-$300,000,000 for the redevelopment, it is the largest MBS project return on investment.
Boss, MO
This site involves the in-line stabilization of lead contaminated slag from a secondary lead smelting operation. Leachable lead levels range from 5mg/L up to 500 mg/L , MBS reagents are added with a volume increase of a proximally 3%. MBS equipment is set up next to a holding tank. Slag is dewatered and fed into the pugmill system with a sand screw. TCLP lead levels are consistently being reduced below proposed UTS criteria.
Glasgow, Scotland
There were severe Hexavalent and trivalent chromium contamination on this site as a result of waste associated with chromites ore processing. Total chromium ranged from 153 ppm to 12.850 ppm with leachable chromium ranging from 88mg/L to 170 mg/L. A conducted treatability study providing MBS will successfully treat both total and leachable Hexavalent chromium and leachable trivalent chromium, Unlike other technologies, MBS does not require a pre-treatment step to convert Hexavalent chromium to the trivalent form prior to stabilization.
Preceding on-site treatment, material was excavated and screened to 2.5 cm. Treatment results mirrored laboratory tests with the leachable Hexavalent and trivalent chromium reduced to fractional / non-detectable levels.
Jersey city, NJ
This site was contaminated from pigment dye veins buried in the ground over a period of 50 years.
As a result, the soil was contaminated with hazardous levels of lead. Portions of the soil were completely discolored and had leachable lead in excess of 600 mg/L the average leachable lead level was 77 mg/L. A conducted treatability study in its laboratory prior to mobilization and also performed a pilot test on site to demonstrate the effectiveness of MBS prior to full scale commercial application. All material was excavated, screened and crushed to 2.5 cm prior to treatment. MBS's equipment was set up within the confines of a 125'X60' area. The pugmill was operated to an average production rate of 400 tons per day, MBS reagents were added with volume increase of only 1.8%.the treated soil was tested for TCLP lead by an independent, state certified laboratory. The TCLP lead levels were reduced from 77mg/L to non-detectable (<0.25 mg/L)
Midvale, Utah
The site was contaminated from foundry and smelting operations, The US EPA National Risk Management Research Laboratory (NRMRL) Superfund Innovative Technology Evaluation (SITE) program conducted demonstration of The MBS process at the Midvale slag Superfund site in Utah, Under the auspices of the EPA, an aggregate total of approximately 500 tones of three wastes streams each contaminated with Arsenic, Cadmium and lead were treated: Soil fill, slag Pile B and Miscellaneous Smelter Waste without brick. TCLP lead values were reduced on the all three wastes to fractional/non-detectable levels.
Additionally Cadmium and Arsenic were simultaneously reduced to below regulatory criteria.
Oceana West Virginia
This site was contaminated from burning of wire copper wires over a 20 years period, tires were used to keep the fire hot, causing elevated TPH levels, in addition to Hazardous levels of lead, Natural environmental conditions turned into a muddy copper ash, mobile equipment was set up at the bottom of the bottom of mountainside next to a highway. All material was screened and crushed to 2.5 cm prior to treatment.
The pugmill was operated to an average production rate of 300 tons per day for this project, somewhat below the standard processing rate, due to the extremely limited area in which to process and severe weather conditions,
The equipment and personal operated in weather conditions that included 10 days of torrential rain, 2 feet of snow and sub freezing temperatures.
These adverse conditions caused the copper ash to turn into a heavy, frozen mud, MBS reagents were added with a volume increase of only 2.0% the treated soil was tested for TCLP lead by an independent state certified laboratory, TCLP lead levels were reduced from an everage of 62 mg /l to fractional levels. It is also important to note, that the presence of TPH not hinder the effectiveness of the MBS process.
Here are some past projects. Listing now.
Don't miss the ADAC boat!
This will be far from the Titantic, this ship is off to smooth sailing.
Screw the other stocks, this one is just getting started.
Are you just checking out the thread? If so then this is a no brainer, pick yourselves up some shares and grow with us.
Don't miss the boat people.
The party is just starting! You are all invited!
I'm not going away, I'm excited in ADAC.
The truth is, in a week when people are paying a penny per share, they will still be happy. So why not buy now at under a half a cent?
These shares should be eaten up, people will be kicking themselves.
I'm honestly trying to make others money, because those who get in now will have a nice payday, that is for sure.
I'll remember that.
So did they repair it, is it usable?
Very true, this is a .05 cent stock even without the dividend imo.
Can I call you Kermit?
Me too.
Set your buy orders and see if you're lucky enough to get them filled.
You will never see these prices again soon, up from here.
These are bargain prices people.
Everyday more and more volume will come.
I see someone bought. Congratulations someone, you will make gobs of money.