Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
Let's see how the Justice reform works out today, this is all about this country moving forward.
The opposition should give a final stand today whether to approve the constitutional amendment package, which is in its final chapter. The final chapter to be discussed today at the meeting of the Special Parliamentary Commission for Justice Reform has to do with control of judges and prosecutors, which will be institutions that will implement this process, control of assets to assessment of their professional integrity. While the majority of the opposition has rejected proposals to reduce the institutions of justice, and at the same time giving an ultimatum that the Democratic Party should reflect within 72 hours. This very day ultimatum expires.
http://www.gazeta-shqip.com/lajme/2016/05/23/skadon-sot-ultimatumi-i-majkos-pritet-reflektimi-i-pd-se-per-reformen-ne-drejtesi/
no problem hbhmb It's fun helping out, putting the puzzle together.
Top/PSPW
Looking at these projects announced, I'm beginning to suspect Shala activity now from my recent DD inquiry last week.
Top/Pspw
Heres another HPP New Katundi ready for concession From the Newspaper Classifieds -
May 19, 2016
This is from the Skactiva project that had so much controversy up in northern albania
Energy Ministry opens proceedings, anticipated duration of the contract is 35 years
New hydropower Katundi expected to be built upstream of the Black Drin River, from the quota 400 meters above sea level to 445 meters quota above sea level on the border with Macedonia has passed another stage. Ministry of Energy and Industry has opened the procedures for granting concessions to economic operators that will express interest. However, currently before everyone in this race are Nurol and Suzer companies that have entered into this procedure together with a bonus of 8 points.
The duration of the concession contract is anticipated to be 35 years and thereafter hydropower exceed state. In assessing the points listed some aspects where the greatest value is the impact of social and ecological and other points of higher concession fees as a percentage of annual energy produced.
Economic operators will have to submit their bids within 11 July 2016. For the winning operator is likely to be a series of obligations for which the sign. Being as the first hydropower scheme Drin river hydrological use, the government will try to prevent negative impacts on hydropower cascade are three other Fierza, Koman and Vau Deja.
"In these conditions, the Contracting Authority reserves the right to require the winning economic operator, the signing of an agreement between the winners and the company" AEC "JSC the manner and amount of water issuing from HEC "New Village" downstream "the ministry said in the document.
New hydropower Katundi "is not unknown to the public. He snare extensively earlier this year when the opposition accused the government of giving improperly bonus points for companies Suzer and Nurol because it is reserved only for cases when a project proposed by them and hydropower plant in question is part of projects identified by governments over the years.
This was just announce on the LUMI Vojosa river I think this one was a highly disputed park project area
The announcement of the outcome of the competitive procedure for the construction of HPP "Poçem"MEI announce the competitive procedure for the construction of HPP "Poçem", Dr. Lorenc Gordani, 21 Maj 2016 (in Albanian)
Commission concession for the construction, use and transfer to the Contracting Authority of HPP "Poçem" has completed the procedure of the race by winning the merger of two companies Turkish "Ayen Enerji Anonim Sirketi" and "Çinar-San Hafriyat Nakliyat Insaat Turizm San Ve Tic ltd.sti ".
Pursuant to Law no. 125/2013 "On concessions and public-private partnership", as amended; Decision no. 575, dated 07.10.2013 "On approval of rules for the evaluation and award of concession / public-private partnership"; DCM nr.576, dated 07.10.2013 "On approval of rules for identifying, evaluating and granting concessions for hydro 'and standard documents of the concession, the Commission has managed the only bid submitted by the union of two companies to verify the legal documentation and the economic and financial process assisted by "Mercados", the consultant selected by the EBRD.
Race was developed through an international open tender and announce a international newspaper for a period of 7 days. At the end of the evaluation, the Commission classified the Provisional Union
Companies "Çinar-San Hafriyat Nakliyat Turizm Insaat San Ve Tic Ltd.Sti" and
"Anonymous Ayen Enerji Sirketi", offering single and declared him the winner of the competitive procedure.
Hydropower has a projected investment value of over 100 million euros, producing
Power is expected to reach 305,393,504 kWh; instalizuar power of 99.500 kW and time of execution of the works 36 months after receipt of the construction permit.
Hydropower characteristics:
- Production of electricity 305,393,504 kWh
- 99.500 kW Power set
- Implementation of works 36 months
- The value of the investment (without VAT) 14,134,724,113 ALL / € 100,962,315
Interconnection: KFW 42 million financing
By Leonard Boduri -
May 17, 2016
Electric lines of high voltage German KFW financially supports the interconnection line that connects our country with Kosovo. Through an agreement, already approved by the Parliamentary Commission of Economy, a new line of 400 kV interconnection between Albania and Kosovo (Tirana 2 -Kosovo b), financed with a loan to value of 42 million euro for the Albanian part of the project and will be a total length of 242 km and represents the most important project of the transmission systems of the two countries. According to the accompanying report of the agreement, the project is divided into two lots. The implementation of this important project for the Albanian power system, reached in December 2015, about 82% of completion.
They slipped this in Friday 5/13 in the government official journal database, It looks like they continue to reform for business.If you build it, it will be the companies obligation to the public, to do it right, and the public's obligation to buy your electric. This is the way I read it.
Top
THE BEGINNING OF THE PROCEDURES FOR APPROVAL OF SOME CHANGES IN THE MODEL CONTRACT BETWEEN PURCHASING POWER OF KESH (WPS) AND SMALL POWER PRODUCERS (PVE) DATE APPROVED BY DECISION nr.80 23.10.2009, as amended pursuant to Article 16; Law no. 43/2015 "On Power Sector" Articles 11 and 14 of the "Conditions for the establishment of the public service obligation, which will apply to licensees ee electricity sector, who operate broadcast production, distribution and supply electricity ", approved by Decision 244, dated 03.30.2016, Article 26 of the Rules of Practice and Procedure of ERE, approved by the Decision of the Board of Commissioners of ERE, no. 21, dated 18.03.2009, as amended, the Board of the Energy Regulatory Entity (ERE), in its meeting dated 13.05.2016, after reviewing the report of the Legal Department and Consumer Protection about some changes in the Model Contract purchase of electricity between KESH and small producers of electricity approved by the Board of Commissioners decision nr.80, dated 23.10.2009, as amended, Observed that:
? ERE has the obligation of adapting the existing legal framework with provisions of law no. 43/2015 "On Power Sector".
REPUBLIC OF ALBANIA
ENERGY REGULATORY AUTHORITY
Board
? With Decision 244, dated 03.30.2016 approved the Rules on conditions for placing the public service obligations on the licensees in the electricity sector. Nëkuptim of this decision in Article 11 of these rules is to determine
1. Any obligation imposed on the licensee in accordance with the legislation in force, in connection with renewable energy sources will be considered a public service obligation.
2. The public service obligation to purchase electricity from renewable energy sources placed the Distribution System Operator, in accordance with applicable law and contract type approved by ERE.
3. In Article 14 of Decision 244 dated 30/3/2016 - is located
? These rules will serve as a temporary model for the functioning of the electricity market until the adoption of the Model Market Power, in accordance with Law no. 43/2015 "On power sector".
? Energy Regulatory Office within 60 days from the entry into force of this decision, adopt the relevant acts for the implementation of the obligations set out in these conditions.
For all the above, the Board of ERE, Decided:
1. Initiation of procedures for the adoption of certain amendments to the Purchase Contract model of electricity between KESH and small producers of electricity approved by the Board of Commissioners decision nr.80, dated 23.10.2009, as amended, with content as follows:
A1. In Headline, the introductory section and elsewhere in the contract with the Parties shall refer to the quality of vendors, manufacturers with Priority Electricity and quality of counterparties Operator Electricity Distribution-OSHEE JSC
A2. Paragraph 5, in the introduction changes and becomes: - ERE with its decision no .___________ dated ___________, __________ Society has licensed for the production of electricity; by HEC / s ______ as defined in the license given by ERE. Oshea JSC must sign a contract for the purchase of electricity with priority producers of electricity in the CMD 244 dated 30.03.2016 "On approval of the conditions for establishing the obligation of public service, which will apply to licensees in the sector ee electricity, who operate broadcast production, the distribution and supply of electricity. ERE has the authority to determine the selling price of electricity producers Electricity priority. A3. In Article 1 Definitions made changes as follows: The term Wholesale Public Supplier replaced with the term OSHEE by definition follows Oshea - is a licensed legal entity responsible for the operation of safe, reliable and efficient network's distribution providing maintenance and developing the distribution system extending in a given area and, where applicable, its connection with other systems to provide skills-term system to meet reasonable demands for the distribution of energy in harmony with the environment and eficenesn energy . A4. Producer term definitions in Part I Small Power Producers replaced with the term priority by definition - Manufacturers priority are producers of electricity from renewable sources of electricity, according to the Law on renewable energy electricity. A5. In part definitions term changes and becomes law, the Law no.43 / 2015 "On power sector". A6. In Section 6.4 is amended authorized term term country authorized subject.
A7. In any case, the authorized representatives of JSC Oshea, according to
Metering Code and the quality of the Energy Buyers can perform in accordance with legislation in force inspections and tests, measurement system and their registration systems. Plant worker t`i designee will make available representatives of JSC OSHEE register meter reading Electricity and create access t`i necessary to control Metering System. A8. In Article 7, the letter b, of paragraph 1 of this Article A9. In Article 8 removed in the last paragraph the words: with the representatives of the Distribution System Operator. A10. This Agreement shall remain in force for a period of 15 (fifteen) years. For entities that have a contract for the sale of electricity KESH energjsie by Decision nr.80 dated 23.10.2009, at the time of entry into force of this contract, the contract for the sale of electricity to be connected to OSHEE period the remainder of the contract conclusion regarding KESH
2. The Legal and Consumer Protection notify OSHEE companies JSC, KESH and the licensee for generation of electricity from renewable sources, the decision of the Board of ERE.
This decision is effective immediately. This decision is published in the Official Journal.
I have never posted over there I just watch the board for opportunity and have looked at different ways they up-list feel free
Top
Yep small pieces still aligning
Top/PSPW
I just want to post this board link for educational purpose, If you have time read back a few posts and see how the companies uplist if interested. Someday This may be PSPW IMO
http://investorshub.advfn.com/Superstar-Uplisters-13018/
Top
Western Balkans 6 TSOs, regulators and energy ministers agree on day-ahead market integration and cross-border balancing targets, 27 Apr 2016
AER Notice 2016
Posted
Today representatives of transmission system operators, national regulatory authorities, and ministries of energy and power exchanges of the Western Balkans 6 countries1 committed to implementing a memorandum of understanding (MoU) setting out general principles of cooperation as well as concrete actions to develop the regional electricity market. The memorandum of understanding was signed at the premises of the Energy Community Secretariat in Vienna.
The MoU’s signatories agreed to implement: day-ahead market integration between the six countries of the WB6 region with the aim of achieving market coupling of national organised day-ahead markets with at least one neighbouring WB6 or EU country by July 2018 and cross-border balancing cooperation between the WB6 countries by December 2018.
The MoU also commits its signatories to follow up with legally binding agreements between the concerned parties. It will facilitate the implementation of the regional electricity market objectives agreed upon by the Energy Ministers in August 2015 and will improve the coordination between Western Balkans 6 in order to create a competitive, efficient and integrated European energy market.
Director of the Energy Community Secretariat, Mr Janez Kopac, said: “The creation of a regional electricity market in the Western Balkans requires active engagement and dedication of all key energy sector players. In terms of having all the necessary preconditions in place for a regional electricity market, we are not there yet as our WB6 monitoring work has shown. However, today’s memorandum of understanding certainly brings us closer to reaching the WB6 commitments agreed at the Western Balkans 6 Summit in Vienna last year. I am thrilled that we were able to bring together all the direct stakeholders – TSOs, regulators, energy ministries and power exchanges - of all six Western Balkan countries under one umbrella agreement.”
“Integrating power markets in the region and with the rest of Europe is an important step in delivering more social and economic welfare to all customers”, commented Konstantin Staschus, ENTSO-E Secretary-General. “Transmission system operators will continue working hard towards the goal of creating a regional electricity market in the Western Balkans in a consistent and coordinated manner with the work already undertaken within the European Union, and of integrating it with the overall European Internal Electricity Market. As in many other processes, TSOs support policy-makers and regulators, and in this instance of the Energy Community, in building ‘power bridges’ between countries”.
The signature of the Memorandum of Understanding by Kosovo* representatives is pending the entry into force of the Connection Agreement between KOSTT and the relevant ENTSO-E members.
This MoU is open for signature by additional WB6 and EU neighbouring stakeholders which are willing and expected to assume a role in the market integration projects.
The Memorandum of Understanding was signed on 27 April by:
For the WB6 Transmission System Operators (TSOs): Operatori i Sistemit të Transmetimit (OST), Nezavisni operator sistema u Bosni i Hercegovini (NOS BiH), Transmission System Operator of Macedonia – Joint Stock Company for Electricity Transmission and Power System Control of Macedonia (AD MEPSO), Electric Transmission System of Montenegro (Crnogorski Elektroprenosni Sistem AD - CGES), JP Elektromreža Srbije (EMS),
For the WB6 National Regulatory Authorities (NRAs): Albanian Energy Regulatory Authority (ERE), State Electricity Regulatory Commission (DERK), Energy Regulatory Commission (ERC), Energy Regulatory Agency (REGAGEN), Energy Agency of the Republic of Serbia (AERS)
For the Power Exchanges (PX) and parties expected to assume responsibilities for market organisation: SEEPEX a.d. Beograd (SEEPEX), COTEE Montenegro
For the WB6 Ministries: Ministry of Energy and Industry of Albania, Ministry of Economy of Macedonia, Ministry of Economy of Montenegro, Ministry of Mining and Energy of Serbia
1 Albania, Bosnia and Herzegovina, Kosovo*, former Yugoslav Republic of Macedonia, Montenegro and Serbia
htpp:www.//regulation.albaniaenergy.org/#post224
Share
Lol keep digging
Top
What licenses are needed to break ground on construction? not sure on what they actually need there, but I'm under the opinion a lot of the license's come as the projects develop from watching devoll build. Maybe the office is a ?
Top
Latest energy project updates No Shala postings, it's going t be a long summer so don't get in a hurry here. The good thought are Devoll has been in construction for quite some time and their still working on license's and there are a couple new projects popping up.
DECISION. 48, dated 29.04.2016 ON THE BEGINNING OF PROCEDURES FOR LICENSING OF SOCIETY "Xhengo ENERGY" SH.PK, for generation of electricity from HEC "hut Selces"
DECISION. 49, dated 29.04.2016 ON THE BEGINNING OF PROCEDURES FOR THE LICENSING OF SOCIETY "Xhengo ENERGY" SH.PK, MERCHANTABILITY ACTIVITY IN ELECTRICITY
DECISION. 50, dated 04.29.2016 ON THE BEGINNING OF PROCEDURES FOR THE LICENSING OF SOCIETY "Xhengo ENERGY" SH.PK, THE ACTIVITY OF SUPPLY OF ELECTRICITY
DECISION. 51, dated 29.04.2016 ON THE LICENSING OF SOCIETY "FREEDOM ENERGY" SH.PK for generation of electricity from HEC "caves beneath 2" in 2300 with an installed power KW
DECISION. 52, dated 29.04.2016 ON THE LICENSING OF SOCIETY "FREEDOM ENERGY" SH.PK TRADING ACTIVITY IN ELECTRICITY
DECISION. 53, dated 29.04.2016 ON THE LICENSING OF SOCIETY "FREEDOM ENERGY" SH.PK ACTIVITY OF SUPPLY OF ELECTRICITY
DECISION. 54, dated 29.04.2016 ON THE BEGINNING OF PROCEDURES FOR THE LICENSING OF SOCIETY "AE DISTRIBUTION" MERCHANTABILITY SH.PK ACTIVITY OF ELECTRICITY
DECISION. 55, dated 04.29.2016 ON THE BEGINNING OF PROCEDURES FOR THE LICENSING OF SOCIETY "AE DISTRIBUTION" SH.PK ACTIVITY OF SUPPLY OF ELECTRICITY
DECISION. 56, dated 04.29.2016 ON THE BEGINNING OF PROCEDURES FOR THE LICENSING OF SOCIETY "Devoll Hydropower" JSC ACTIVITY OF SUPPLY OF ELECTRICITY
DECISION. 57, dated 29.04.2016 ON THE BEGINNING OF PROCEDURES FOR THE LICENSING OF SOCIETY "DAAB ENERGY GROUP" SH.PK for generation of electricity from HEC "-TOMORRICË DOBRENJË 2400 with installed power KW
DECISION. 58, dated 04.29.2016 ON THE BEGINNING OF PROCEDURES FOR THE LICENSING OF SOCIETY "DAAB ENERGY GROUP" MERCHANTABILITY SH.PK ACTIVITY OF ELECTRICITY
DECISION. 59, dated 29.04.2016 of initiating procedures for the approval of "GENERAL CONTRACT CONDITIONS OF UNIVERSAL SERVICE SUPPLY OF ELECTRICITY TO END CUSTOMERS"
DECISION. 60, dated 04.29.2016 ON THE BEGINNING OF PROCEDURE FOR REVIEW OF DRAFT - REGULATION ON THE LINKS ON DISTRIBUTION SYSTEM
I had my post worded wrong so I deleted, to much coffee this morning,
Top
I take this as a WIN for business's and possibly our project.
Top
Kosovo and Albania, agreements to protect investments
English newspapers -
May 4, 2016
KESH Two ministers of Kosovo and Albania, Hykmete Bajrami and Milva Ekonomi, signed the agreement for the promotion and protection of investments. The agreement gives investors of each country, security and guarantee that their investments will be protected and treated fairly in full compliance with the rule of law, standards and accepted international practices. Economy Minister at the meeting praised the growth of direct investment from Kosovo to Albania and increase trade volume between the countries in 2015. The two ministers also discussed the progress of implementation of the agreement on trade facilitation.
you will have to google translate below, Does this include all investors (foreign?)
http://www.gazeta-shqip.com/lajme/2016/05/04/kosova-dhe-shqiperia-marreveshje-per-te-mbrojtur-investimet/
Time for a vote for the country to let Albania grow jobs and new business's
"said Meta.yesterday the justice reform has been completed, as this was what we expected, it has been the final word of the Venice Commission, which is given and the final word and OPDAT EURALIUS experts. From yesterday, with the final delivery of expert opinions, everything is finished. We were ready to vote with that yesterday. LSI worked reform to include as many actors and believe that inclusion has been a dimension of this reform. Every minute that passes is counterproductive and jeopardize our agenda on the EU path."
This is like a jigsaw puzzle and scavenger hunt, but the pieces continue to fall in place.
Top
The Energy Community Secretariat said Albania, Macedonia and Bosnia and Herzegovina rectified the failure to comply with the renewable energy directive (2009/28/EC).
Albania’s and Macedonia adopted National Renewable Energy Action Plans (NREAP) earlier this year, while BiH submitted its own, formally bringing cases ECS-3/14, ECS-4/14, ECS-5/14 to the end, the secretariat said on its website. This is without prejudice to the fact that Macedonia’s NREAP has to be reviewed to include updated biomass data, the statement adds.
Last year’s decision of the Ministerial Council established the failure to comply with Energy Community law, where a series of dispute settlement cases were initiated by the secretariat in February 2014. The round had included Montenegro and Ukraine, but the two contracting parties rectified breaches by the end of that year. The obligation to adopt an action plan stems from directive 2009/28/EC on the promotion of the use of energy from renewable sources, adopted in the Energy Community in 2012.
http://balkangreenenergynews.com/albania-macedonia-bih-abide-by-renewables-directive/
Austrian Kelag Group, owned by German multinational energy company RWE, signed a letter of intent with electricity distribution Elektro Celje d. d. about a strategic partnership. In the next phase it may enter its trading enterprise Elektro Celje energija (ECE), which controls 23% of Slovenian power market and supplies over 200,000 households. “We are analyzing possible models. Several options are open,” Rade Kneževic, Elektro Celje’s departing managing director, told Dnevnik newspaper. Almost 75% of ECE is owned by the company.
RWE has been trying to grow its operations in the electricity distribution market in Slovenia. Through its Croatian subsidiary last year it entered the households segment, and it has been speculated in the media that the German company is preparing to obtain an ownership share in one of state-owned electricity traders, the article said.
Kelag is already present in Slovenia through Interenergo d. o. o., which owns several hydropower plants in the region of former Yugoslavia. The chief executive of the company is Anton Papež, known for close ties with Miro Cerar, prime minister of Slovenia, Dnevnik said. The key lobbyist of Kelag in the country is Benjamin Wakounig, who heads the Slovenian Economic Association (SGZ) in
http://balkangreenenergynews.com/rwe-wants-bigger-share-in-power-distribution-market/
ERE step regulation procedures for new connections to the distribution system, Dr. Gordani Lawrence, 29 April 2016
Albanian Association of Renewable Energy - AREA considers as very positive the decision of the Energy Regulatory Office, the meeting dated 29.04.2016, on the initiation of the procedure for adoption of the "Draft Regulation for New Connections Distribution System" (ref. Department legal and Consumer Protection). A decision in line with the commitment expressed during the General Assembly of AREA's on 28 April 2016, in the framework of "Plan and Program Objectives for 2016".
Specifically in connection with the foregoing Area will submit the official request for inclusion closely in the consultation process of the Rules for New Connections Distribution System. Indeed, in this respect under the Energy Sector Law 43/2015 provides guaranteed access to renewable energy producers with priority dispatching of electricity from renewable sources, but secondary legislation so far has not been complete. Priorities for approval by ERE is necessary procedural measures as well as preparing the documentation relative to link generating facilities.
In particular, network operators need to increase transparency to investors with respect to access to networks based on the methodology for determining the cost of connection to the nearest point in the network. All must be done in order to bring a performance improvement through investments in network and establishing clear procedures in practice and prompt compensation in case of lack of network capacity in conformity with the provisions of Article 16 of the Renewable Energy Directive.
In the same framework requires the approval of administrative procedures simplified for granting authorizations for producers of renewable energy in accordance with the requirements of the Law on Energy Sector 2015 and especially as defined by Article 13 of Directive Renewable Energy for procedures streamlined and simplified between institutions.
On the foregoing it is considered useful to recall once again that the current developments in the sector make the necessary construction of a framework of "smart" regulatory facilitate profitable investments in efforts to arrive in the most sustainable goals national consumption to 38%. In the interest of as preceding the opening of the "Draft Regulation on new connections to the distribution system" constitutes an important step in support of investments made and further development of the sector by encouraging the application of methods dealing with EU policies in 2020 and beyond to 2030
Is it a iceberg seller or a Rat hole trader?
Deal show is over now and Mr.Falaknaz seems very current with today's trend.
http://www.arabianbusiness.com/company-news/details/?pressReleaseId=51921&ref=nnm
Top
Picked up nice little 10k this morning more free shares thanks to Apple trading
Top
The shala concessions were done under Sali Berisha leadership with many others, but it's time to go Berisha, Let the people have this country and let it grow.(PD is feeling the loss of control pressure)
After the call for the arms of Albanians yesterday in Parliament by Sali Berisha, Prime Minister Edi Rama has urged the Prosecutor General to immediately initiate an investigation of this statement.
In a press conference, Berisha described Rama as a "funny character" that every Thursday closing process continues to drag on judicial reform. "Berisha is afraid of reform in justice" - he said.
"There are several reasons to investigate Berisha, this call of the people to be armed is just one more reason, in a normal country should be crier to prosecutors, the law says so in a normal country. But Albania can not be a totally normal for some time as written in the law does not apply equally to all. Albania normal country can become normal people who deserve this country for whom the law is read and applied differently from those who make the laws, pay taxes or Albanians to treat everyone as equals, "he said.
Berisha has not been investigated to date up to what has become or be investigated for what said yesterday, as long as justice reform and voted not apply.
Rama said that Sali Berisha and the PD does not want justice reform.
"Basically calling Sali is one more fact that is known for one thing, inequality before the law. Precisely the privilege of being above the law is the essence of judicial reform. Sali is tipical, so pick the more striking is the strong image of the suit. Therefore on Thursday did not say what laws, but the law indicated weakness citizens before a funny character, that in every country of Europe and the world would have arranged with time.
Actually it came in yesterday stood artificial tension Sali and his group have led to the roof, calling for the arms. PM Sali Berisha and do not want judicial reform.
The more approaching deadlines fans reform more desperation Sali becomes desperation PD, the more deepen political criminal treatment of PD government, instead of coming to the increase in respect of the Albanians, the intensity of the work for reform has come in PD artificial tension that increase with Sali in the top of the canopy led to urging people to pick up weapons.
The White House and a clear message for justice reform to the Albanian people and the requirement to become a member in the EU, "said Rama.
https://translate.google.com/translate?sl=sq&tl=en&js=y&prev=_t&hl=en&ie=UTF-8&u=http%3A%2F%2Fwww.gazeta-shqip.com%2Flajme%2F&edit-text=&act=url
https://translate.google.com/translate?sl=sq&tl=en&js=y&prev=_t&hl=en&ie=UTF-8&u=http%3A%2F%2Fwww.gazeta-shqip.com%2Flajme%2F&edit-text=&act=u
The perfect Iceburg Play
Really nice Thanks
Top/Pspw
Judicial reform is close now, which will be huge for Albania business.
And everyone will have a electric meter soon. The big picture conditions are turning favorable for the people and business. The country is evolving.
Hoffman: "The judicial reform should be adopted before the summer"
Gjiknuri: "Within June, all customers with meters"
Top
Becareful and take care ed3/6me
Top
Interesting isn't it, the size of companies that have bought the rights to these concessions from the previous administration.
Top/pspw
In New York yesterday
This time were numerous citizens of Albanian diaspora, who have come up with placards, asking the head of government as not to damage the Valbona area by building hydroelectric power plants.
From 2011 to 2015, 460 companies raised 53 billion pounds, or about $76 billion at current exchange rates, through new listings on the London Stock Exchange, according to the regulator. That included 199 I.P.O.s last year. WOW!
A vast majority of I.P.O.s in Britain are carried out through private placements to institutional investors, such as insurance companies and pension funds, with a few offerings including the sale of a small percentage of shares to retail investors.
http://www.nytimes.com/2016/04/14/business/dealbook/britain-ipo-fca.html?partner=rss&emc=rss&_r=0
Top/PSPW
Thank you Sir
Always looking for feedback, good or bad, looking for loopholes in this organization. And I would not suggest anyone taking a position in this stock until they did a lot of reading.
The person that just stops by this board or is told about it at the water fountain is not going to be able to comprehend what has taken place here without their own reading and commitment to research through the financials filed.
The longs here have endured and have been educated thru a period of progression in this stock. I have looked hard to find a reason, and talked with others on different scenarios’ trying to fault this stock. The problem is a group of longs here can’t find a reason why they would stop on PSPW.
With every rebuttal posted it has had a logical reason on why there doing it the way they are and it’s answered in the financials, less lack of communication to shareholders. (Imo)
But I feel this is the way it has to be until the time is right. The more I look at the execution of the projects, the more brilliant it presents itself, this is big business at work.
The financials hold the answers to every question that could be asked except when it’s exactly going to happen.
I will give you credit on the painting of the tape, I take a daily screen shot of shares traded and there is a large number of low volume trades shown, but when a buyer comes in, she moves upward fast. The numbers have not changed; (reference sticky above share allotments) I know where approximately 10 million of those shares are from April 13 to Dec 15 from different people, and the accumulation line speaks for itself. What’s the real reason on propping it up? Is it more attractive at 12 cents instead of 5 cents? Flippers can’t make money on no volume, and there’s no news. And if they do make a dollar who cares.
Dubai group is in control here and it does not make any sense for them to work against SEC policies, PSPW files there financials they told us in the filings that Falak holdings was there OPEC.
OPEC means operating expenses, Research and development and general administration costs provided.
So after reading your post and your comment back to me about painting, It’s Interesting how tuned in you are on the volume for a non-poster, I figure you are probably looking for some PRO responses to your post to help further entice buying of the stock since our volume has slowed, allowing you to flip some more of your shares. All IMO
Top
One of the reasons I recently posted on how a concession agreement works in Albania
Technical and non-technical terms of agreements and public-private partnership kocensionare are confidential and can not be disclosed to third parties without the consent of all parties involved in the agreement kocensionit.
Imo falak 'a meeting was discussing terms with Energy minister. When Falak says go with Energy minister its go time.