Gas power plants, one in Korça and one in Kuçova 400mw total
http://gazeta-shqip.com/lajme/2017/11/15/termocentralet-me-gaz-nje-ne-korce-e-nje-ne-kucove/
Gas power plants, one in Korça and one in Kuçova
from Albanian newspaper - 15 November 2017 62 0
The TAP pipeline construction has opened up prospects for building new energy sources in the south of the country.
According to the gas master plan in Albania are two new power plants that can be built in the Korça and Kucova areas near the pipeline route and pumping stations.
Both Korça and Kuçova have previously TEC with mazut, but have been extinguished for decades. The establishment of these two fuel stations comes as an idea at a time when Albania is running an energy production crisis in the Cascade of Drini due to drought and lack of alternative sources.
Vlora TEC is out of order and with the technology it has, the cost of energy production comes out too high. It is also anticipated to be adapted to use natural gas as raw material.
New power plants are foreseen as concessions and to stimulate important investments, the Government's proposal has reached the Assembly that for investments over 100 million euros in energy and with installed power over 2 megawatt, the procedures are accelerated.
The Korca power plant is projected with a power of 200 megawatts and annual consumption will reach up to 125 million cubic meters / cubic meter of gas per year. The same consumption level is also foreseen for the Kuçova TEC.
November 14, 2017 ( papers - in English . Com
Oh no first hearing then vision please re read. Lol
Long time no post stkgrl what have you been doing, still hanging on I see, hows the weather in your parts?
Top
WHAT DID YOU SAY?
Actually BLOCK would not work because there are people that provide very good information viewpoints replying to a post you created and it would eliminates those post as well,
It's just the system and how it works,
Top
I have people who don't post here but read the board emailing me asking me why that one guy types in capitals all the time,
I just tell them he's like the dukes of hazard song just a good old boy,
Top
Like you say when anyone try's to speculate on their path need a 8k glad to see you bought a keyboard
Top
Very good posts CP your right on target, I took 3.5 cents out and am content with that.
Top
they put your girl in
Sinead Heinl and
Esmeralda Removed.
Not what I was expecting Oh well only 2 more left.
Our new Dam You missed this Pspw has started operation with the Energy Minister
I hope you make some money
business 101 on a start-up, and two tours
OMG a bus tour, (Welcome to Jurassic Park), They were looking for investors also. I think they were also going to have a coupon day.
I'm going to stay with Billionaires investing and reference the projects they have already created with their vision. I don't need a bus tour to a greenhouse.
Top/Pspw
Yes the PSPW operations are in Albania,
I’m sorry you traveled to Dubai, It must have been boring talking to that mailbox.
That’s why SIGO it is such a good comparison for us to evaluate your interest in PSPW, They have no business contracts, No 8k for business,
They have generated $0 in revenues as of July 31, 2017
Hey but they just paid a dividend
SIGO will be $10.00 per share very soon based on all the expansion going on!
Rumor is PSPW and SIGO may merge
SIGO Operating Income is (174) LOL
I think it could easily hit $1.40 very soon
I think it was Dubai (lol) It doesn't Matter
Top/pspw
Thanks you just answered the question. As thought
Top/pspw
projects and people slowly may be reviling not as some may expect.
top/pspw
I agree Go PSPW do you have a link to the DCM?
Top/pspw
Very good my friend you could be right on target
I have been monitoring the official gazette pages of the parliament and have not seen it
Top/pspw
Should it be logged officially before it appears there?
Top/Pspw
No Soup for you!!!!
Where have you Been?
Top
Talk about being late on updated financials OMG.
The last Sec filing said they had 100mw shovel ready, That's my guess, maybe split up? who knows, We will have to wait till the next clue is discovered.
Top/pspw
I will start the week with this DD, I could be totally wrong but I think this is the shovel ready project below, it fits the 100MW criteria. I had never seen it but one of our other longs mentioned something about looking at the Lumi Shale river that put me on this thought of starting to look for this project. Thanks MQ it's a very good view
It Can be seen from the google earth view below.
(you may need google chrome to open)
These guys like big and this fit's the Mold, The 3power/shala new partner Cinar-San helped build part of this at 30% completion.
Now it's just sitting, with the gov having lost hundreds of millions on this project.
https://earth.google.com/web/@40.39788901,19.79913772,117.03860625a,963.19613211d,35y,-74.12681623h,60t,0.00000085r
Albania May 31, 2017
The Albanian Ministry of Energy and Industry published a tender for the construction of the Kalivac hydropower plant on the river Vjosa and concession to produce power for the national grid over a period of 35 years. The private/public partnership project includes the construction of a dam along with the power plant, the ministry statement said.
The hydropower plant will be built near the Kalivac village, in southern Albania, the ministry said in a contract notice published on the website of the Albanian Public Procurement Agency.
The statement said that Albania gets 100% of its electricity from hydropower plants but that no new major power generation facilities have been built in the country for more than 30 years. It added that seven medium sized hydropower plants of a total of 130 MW were built between 2012 and 2015.
According to a 2008 report by the Energy Community, Albania produced 98% of its electricity from hydropower plants, most of it from three power plants along the Drin river. The country’s only thermal power plant Fier, which had six 31 MW generators, was shut down as an unsustainable enterprise because of its antiquated technology and high oil prices.
The ministry set six criteria for the concession – the value of the concession fee, ecological and social effects, installed power, project completion time frame, connection to the national power grid and an assessment of the work carried out by the previous concession holder.
The ministry broke off a concession contract for the Kalivac power plant with the Italian company BEG which agreed to build a 108 MW hydropower plant in 2012 but failed to complete the project. BEG filed law suits against a number of local subcontractors.
https://balkangreenenergynews.com/albania-published-tender-for-hpp-kalivac/
Ratings are verified Hmmm!
Top/Pspw
Just Received a nice confirmation
Hi XXX
We have checked the database and can confirm that we received a rating “3” which is converted to “Perform” from MSCI Inc. for 3POWER ENERGY GROUP INC (Symbol = PSPW) on 2017-09-22.
MSCI Inc. has been sending their rating updates to us directly for a few years and their ratings are verified.
Please let us know if you have further questions.
Best Regards,
XXXX
Netologic dba Investars
MSCI Inc resumes coverage for 3POWER ENERGY GP COM STK USD0.0001 with 3 recommendation.
BY Investars Analyst Actions - public
— 7:56 PM ET 09/23/2017
On September 22, 2017 MSCI Inc resumed coverage for 3POWER ENERGY GP COM STK USD0.0001 with a 3 recommendation.
They must have picked up on something in china, looking at there page below, they have a lot of overseas coverage (Just a thought)
https://www.msci.com/press-room
Top/PSPW
Future123 is our DD/DH (Designated Hitter) he shows up when you least expect it, and smacks the ball over the wall.
Top
lol don't look in the mirror brother
Top
No problem,
Thanks all,
Just trying to keep some of the recent info to the top of the Intro for new comers
since there is quite a bit of relevant information provided from everyone who has provided research.
Top/Pspw
Energy Market Albania-Kosovo, meeting between ministers Gjiknuri and Llukaj
Minister of Infrastructure and Energy Damian Gjiknuri hosted in a meeting the Minister of Economic Development of Kosovo Valdrin Lluka and the delegation accompanying him.
During the conversation, the parties focused on the steps taken so far in the framework of the project of creating a common electricity market between Albania and Kosovo.
"A fruitful conversation between the two delegations and that precedes the joint meeting of governments. We have a good job already started with Kosovo to create a common energy market. We decided to reactivate working groups to move forward towards unifying markets. It was discussed the continuation of the process of creating Energy Exchange in Albania and Kosovo's readiness to participate in it, "underlined Minister Gjiknuri.
Minister Lluka emphasized the prospect of Albanian energy stock and Kosovo's involvement in it.
"We discussed the common market, the Albanian energy exchange, part of which we hope to be. We committed ourselves to making the groups more active in intensifying work between the two countries. The Kosovo Transmission will be part of the Albanian stock exchange as a shareholder and the working group will further define the details. We agreed to have a co-ordinating group at the political level to help move faster on a common agenda, "said Luke.
The two ministers committed themselves to further reconciliation of actions for setting up the 400kW interconnection line between the two countries.
"We also discussed a very important issue that has become a problem, not between our countries but with other countries in the region. I am talking about the operation of the Albania-Kosovo interconnection line, an important investment from European Union countries, a project within the interconnection and in essence the integration of our countries. Albania will play the role of supporters for this project, we will strongly lobby the two countries in every forum where we are to point out to European partners that putting this line into operation is the alpha and omega of everything for the energy integration of two countries. We will do everything to raise this issue at the highest levels, "said Minister Gjiknuri.
In the assessment of Minister Llukaj, the transmission line remains inactive for political reasons.
"It comes because of the problems we have with Serbia. Albania will continue to support us in this regard. This is important because as Kosovo we need more than ever to be part of Europe's broadcasting network, "Llukaj explained.
http://www.energjia.gov.al/al/njoftime/deklarata-per-shtyp/tregu-energjitik-shqiperi-kosove-takim-mes-ministrave-gjiknuri-e-lluka
Word is good coming from the boots on the ground, If your hanging onto these stocks without over seas due diligent research then you are one brave person, I would have been long gone, sometimes you just have to find the right agency and make the financial commitment and then base your position size to prosper. people talk, information is available you just have to find out who to talk to. Gequ will be fine, Duuo will be fine. Rest easy
Top
Great seeing some of the Old names posting again, OLD and New Thank you for checking in.
This company has re-emerged from the Seawind days and a reverse merger, to something with much possibilities.
As Joe Monte has spelled it out, It is a plan of Major shareholders from Dubai diversifying their portfolio and creating a renewable energy company with majority control.( It's that straight forward)
It's been a rocky ride, from Seawind, Cancellations of concession and silence, but our DD team has keep digging.
We only get pieces of their plan but things appear to be taking shape, Feel free to pass your email address through to some of the longs on the board so we can stay in touch.
Best Regards
Top/PSPW
A read about Sports city Dubai and information from a reporters perspective that talks about alot of different things.
http://www.nytimes.com/2008/03/06/sports/06iht-MECCA.1.10763441.html
Top/pspw
Made a few dollars on a simple trade Friday after hours and decided to take my 100 dollars profit and buy a few PSPW,
I really don't need it but figured it may be worth a little more next year.
I have been watching Time and sales and seen a 666 order last week during the busy trading and had researched, they say that is a MM signal to push it back down lower, I don't know much about this stuff, if it's true, but did a little reading on it.
So I put a order in for 911 before market open Monday @ 10 cents Limit, just to see what happens, on open I received 200 shares @ .08 cents (lol) and the remainder did not fill the rest of the day, (see trades)
It was mentioned to me that they did not want that 911 order setting there, Who knows, why did they take it to .08 for 200 shares, really?
I may be wrong, but I don't think there is much of this stock setting around, but that's my opinion, But this is the rest of the story.