Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
How high did it pop last time? Is the accumulation line still ready to blow up?
It's time ......!!!!!
Wake everybody up!!!! I want some 1's lol!!!
Nice!!!!! We knew it was coming!!!!
You did ... Thank you.
It's getting there!!!! The buying pressure has been nice and steady the whole day... When this goes into power hour... Blast off to new highs. That dollar prediction is looking real good.
Agreed!!! I have a feeling we are closing in on .5 today!!!
I agree something big happening here!!!!
Link please.
New pictures on Facebook of the rigs just went up... Check it out
Pics are now up from the press Conferance on Fbook... Go TECO!!!
September 15, 2011
From: Steve York
Re: Belize Drilling Rig & Location
On Sunday, September 18, 2011 I am sending Treaty Energy Drilling Superintendent, W. D. “Bill” Harden to Belize. Bill will begin the drilling operation activities as detailed in the September 13, 2011 memo.
Bill will move the rig onto the drilling pad and begin to take measurements and readings to determine the worthiness of the drill site, pad, and all variables associated with the drilling procedures. Furthermore, since this is the first well drilled in Belize and the first well for this rig, Bill will construct the layout of the drill site in order to facilitate the mud pits, drill pipe handling location, and all other equipment which must be present in order to drill TECO’s first well.
Since we are dealing with many variables and unknowns, his expertise will expedite all the activities and procedures necessary to keep Treaty on our drilling timeline.
I will apprise you and the Board of Directors early next week with reports detailing our progress and results.
Steve
Keep posting all the good news and hold patiently we know what we have and where we should be!!!!! Spread the word and help your investment grow... GLTA
It was posted on the fb page
September 13, 2011
From: Steve York
Belize Drilling Rig & Location
In the next 48 hours I have instructed the Belize crew to move the rig to the drill site. Before we turn a bit, many items must be checked and addressed.
The weight of the rig will determine if the pad is ready to withstand the workload rigors. If the pad is not compacted enough then more preparation is needed.
The accuracy of the pad must be determined. The rig must sit perpendicular and parallel to the well location and must maintain that position throughout the entire drilling process.
The daily rain will also come into play as we determine whether the rig will sit on the compacted stone bed, additional timber or planks are needed, or even concrete pillars to stabilize the rig in the face of any weather situations.
This being our first drilling venture in Belize, every aspect must be addressed for safety and to maximize the efficiency of the drilling process. Mistakes and miscalculations will cost time and money that is best spent elsewhere.
The drill pipe, mud pump motors, drilling rig tools and accessories, and a test tank are on the ship and should be to customs in 5-8 days. Additionally, drill collars, BOP, mud pump, casing (surface, intermediate, and production), mud and chemicals, cement and drill bits will be trucked from Texas this week and will arrive approximately the same time as the ship. This should be the majority of the equipment and supplies needed for the first well.
The drilling timeline will be determined by the drilling pad integrity. As soon as we are satisfied with the pad, drilling will commence.
I will keep you apprised of the pad test and the shipping arrival dates.
Steve
Great stuff this IMO is such a steal to buy and hold on for the ride!!! GLTA
You the man!
Wow that is ridiculous great news!!!! That alone should increase the pps so much potential we have a real chance to get in before this thing explodes!!!
Needed to read that, long and strong!!!!! Go TECO
This pisses me off!!! So much news and this is where we are at!!!!
With all this news , we have to explode!!!!!
Thanks let's get paid BFHJ!!!!!
Saying what?
BFHJ it's our season!!!
Wow great news if now is not the time to get in, I don't know when "when" is!!!!!
Agreed stay strong!!!
Can somebody copy and paste the highlights from Facebook from the Treaty page so others can see....(I'm on my phone)
I agree!! Looking forward to our season stock up now and play it right....
Looks great!!! GLTA BFHJ!!!
New logo is out and they said more info coming shortly!!!! Go TECO!!!
Support your company add them to your Facebook.... They are posting up pictures of the operation in Belize.... This looks promising and I'm happy that they are communicating this way too. Will increase my position on Monday. GLTA!!!
TECO just put a pic of the primary rig in Belize on the Facebook page.... FYI..
Maybe they know something you don't...... They don't just do this for nothing... Just saying!!!
Debbie Downers!!!
Great news!!!!!! If you build it , they will come!!!! BFHJ !!!!
Go TECO!!!!!
These are prs, like it or not!! Spread the word this is a buy at these levels... Will add more!!! Go BFHJ!!!! it's that time of year.....
I like it!! I believe this will happen.
We are waiting.....
There's no way in hell that with all these games coming out that this thing won't move up!!! Hang tight people our season is coming soon!!!! Make one for the iPad and watch!!!! Lfbg!!