Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
Lithium South: 2022 Achievements and 2023 Milestones
January 5, 2023 / Vancouver, BC / Lithium South Development Corporation (the “Company”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) is pleased to provide a 2022 summary of milestones achieved and a milestone plan for 2023.
https://www.lithiumsouth.com/posts/lithium-south-2022-achievements-and-2023-milestones/
Chemphys
DIRECT LITHIUM EXTRACTION & PROCESSING TEAM
Chemphys have an 11-member technical team working full time on development of the Direct Lithium Extraction Technology. Founded in 1998, Chemphys is recognized as one of the world’s leading lithium processing and technology companies with over 22 patents (valid and under application) developed in-house.
https://www.lithiumsouth.com/leadership/
Lithium South Development Corporation
@LithiumSouth
Lithium South is a project developer focused on the Hombre Muerto North Lithium Project in Argentina.
TSX-V: LIS | OTCQB: LISMF | FRA: OGPQ
Twitter..
https://twitter.com/LithiumSouth?ref_src=twsrc%5Egoogle%7Ctwcamp%5Eserp%7Ctwgr%5Eauthor
Episode 76: Alison Dai
The Global Lithium Podcast • Aug 21, 2020
https://anchor.fm/globallithium/episodes/Episode-76-Alison-Dai-eifj4r
Alison Dai
Director at Chengdu Chemphys Chemical Industry Co, Ltd
https://www.linkedin.com/in/alison-dai-12a997b4/
LithiumSouth
Alison Dai
DIRECTOR
Ms. Dai has 7 years of experience in the lithium industry and is responsible for business development and is a director for Chengdu Chemphys Chemical Industry Co., Ltd. In her role at Chemphys, Ms. Dai has been involved in developing strategic partnerships, international markets and procurement. Prior to joining Chemphys, Ms. Dai was an investment banking analyst at J.P. Morgan Australia in the mining and metals team. Ms. Dai holds a double degree in Bachelor of Laws and Bachelor of Commerce from the University of Western Australia.
https://www.lithiumsouth.com/leadership/
Lithium South Development Corporation: Doubling of Lithium Recovery From Brine with Chemphys Process
https://www.prnewswire.com/news-releases/lithium-south-development-corporation-doubling-of-lithium-recovery-from-brine-with-chemphys-process-301248906.html
LI has been the mover - not LIS
https://bigcharts.marketwatch.com/advchart/frames/frames.asp?show=&insttype=&symb=ca%3ALI&x=43&y=13&time=100&startdate=2%2F4%2F2020&enddate=1%2F19%2F2023&freq=1&compidx=aaaaa%3A0&comptemptext=&comp=none&ma=0&maval=9&uf=0&lf=1&lf2=0&lf3=0&type=2&style=320&size=3&timeFrameToggle=false&compareToToggle=false&indicatorsToggle=false&chartStyleToggle=false&state=9
https://bigcharts.marketwatch.com/advchart/frames/frames.asp?show=&insttype=Stock&symb=ca%3ALIS&x=46&y=11&time=100&startdate=2%2F4%2F2020&enddate=1%2F19%2F2023&freq=1&compidx=aaaaa%3A0&comptemptext=&comp=none&ma=0&maval=9&uf=0&lf=1&lf2=0&lf3=0&type=2&style=320&size=3&timeFrameToggle=false&compareToToggle=false&indicatorsToggle=false&chartStyleToggle=false&state=9
December 13, 2022 / Vancouver, BC / Lithium South Development Corporation (the “Company”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) is pleased to provide results from the ongoing drill campaign at the Hombre Muerto North Lithium Project (HMN Li Project) in Salta Province, Argentina. The resource expansion drill program is comprised of four core holes (Holes AS01, AS02, AS03 and AS04) located north to south, along a channelized extension off the main salar, and three core holes (Holes AS05, AS06 and AS07) along the west side of the channel (see enclosed drill map). Two drill rigs are operating on site.
https://www.lithiumsouth.com/posts/lithium-south-provides-further-excellent-lithium-results/
239 views Streamed live on Oct 10, 2022
Lithium South Announces Final Property Payment on 3287 Hectare Hombre Muerto North Lithium Project
March 3, 2022 / Vancouver, BC / Lithium South Development Corporation (the “Company”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ). Lithium South Development Corp. has completed the last payment for the acquisition of the 3,287-hectare Hombre Muerto North lithium project located in Salta province, Argentina, as initially announced on June 5, 2017. The final payment included the issuance of 1.75 million common shares at a deemed price of 58 cents to Jorge E. Moreno and Alba Silvia Sala (the vendors) pursuant to a mining exploration agreement with option to purchase dated May 17, 2017, as amended on Oct. 31, 2017, and April 22, 2018, entered into with the vendors regarding the Hombre Muerto North lithium project.
Pursuant to the payment schedule under the agreement, the company paid a total of US $5.65 million and issued a total of 10 million common shares to the vendors and has completed its obligations thereunder. The vendors agree to assign and transfer 100 percent of the rights of assignment, title, and interest in the property to the company free from any liens or encumbrances. The vendors shall retain a 3 percent royalty on the net return from the production of lithium carbonate and/or from any other product derived from brine operations.
https://www.lithiumsouth.com/posts/lithium-south-announces-final-property-payment-on-3287-hectare-hombre-muerto-north-lithium-project/
Lithium South Development Corporation
1d • Edited • 1 day ago
Drill program to begin at Alba Sabrina claim. We are excited to begin the potential expansion of the high-quality #lithium brine resource at the HMN Li Project, in Salta, #Argentina.
#LIS #LISMF #RCK #NLC #TSLA #CYP #ML #Investing #Stocks
Details: https://lnkd.in/gW9JxwBX
https://www.linkedin.com/feed/update/urn:li:activity:6924719286263431168/
ah - I see Thanks
Googled Salar de Hombre Muerto Bearing Lithium (because aren't they there also or - if not then who else is - Origen ?)
https://www.google.ca/search?q=+Salar+de+Hombre+Muerto+bearing+&sxsrf=APq-WBuZnIjM_T0tjccz3AVS_x19IhXgFQ%3A1647981062401&source=hp&ei=BjI6Yr6MFYfb0PEPnO6Z6AY&iflsig=AHkkrS4AAAAAYjpAFl-nI6m7W2UfUB4b2TLUhefn6jdh&ved=0ahUKEwi-p8Xux9r2AhWHLTQIHRx3Bm0Q4dUDCAk&uact=5&oq=+Salar+de+Hombre+Muerto+bearing+&gs_lcp=Cgdnd3Mtd2l6EAM6CAguEIAEENQCOgYIABAWEB46BQgAEIAEOgUIIRCgAToHCCEQChCgAToECCEQFVAAWK8rYIU_aABwAHgAgAFdiAGSBpIBAjEwmAEAoAECoAEB&sclient=gws-wiz
https://www.lithiumsouth.com/posts/agreement-to-aquire-teh-hombre-muerto-north-lithium-project-adjacent-to-lithium-production/
Nope . Not Origen
https://bigcharts.marketwatch.com/advchart/frames/frames.asp?show=&insttype=&symb=ca%3Aorgn&x=47&y=8&time=100&startdate=2%2F4%2F2020&enddate=4%2F21%2F2022&freq=1&compidx=aaaaa%3A0&comptemptext=&comp=none&ma=0&maval=9&uf=0&lf=1&lf2=0&lf3=0&type=2&style=320&size=3&timeFrameToggle=false&compareToToggle=false&indicatorsToggle=false&chartStyleToggle=false&state=9
salar de hombre origen tsxv cdnx
ALLI
https://bigcharts.marketwatch.com/advchart/frames/frames.asp?show=&insttype=&symb=ca%3Aalli&x=48&y=14&time=100&startdate=2%2F4%2F2020&enddate=4%2F21%2F2022&freq=1&compidx=aaaaa%3A0&comptemptext=&comp=none&ma=0&maval=9&uf=0&lf=1&lf2=0&lf3=0&type=2&style=320&size=3&timeFrameToggle=false&compareToToggle=false&indicatorsToggle=false&chartStyleToggle=false&state=9
hmmmm - Okay - Who dat (der neighbour ?)
Can't remember
Hombre Muerto Salar where Lithium South has a major chunk...
Just got a 4$billion commitment yesterday from their next door neighbor
So...suddenly their lease is?
futr
Must be getting close-
futr
Yes indeed!
Happy St.Patrick's Day to ya!
futr
Lithium South Development Corporation
186 followers
2h • 2 hours ago
Completion of the Environmental Baseline Study is an important milestone for the development of the HMN #Lithium Project and a key component toward the completion of a Feasibility Study.
#LIS #LISMF #Investing #Stocks
Details: https://lnkd.in/gA_dcY3V
https://www.linkedin.com/feed/update/urn:li:activity:6910246090420211712/
Thank you futrcash.
I will do some DD here tonight and the next few days as well.
They have brines being tested.
I hope those brines get sent to Novonix to be made into batteries. That would be the next step.
I agree...mostly for political reasons
BTW...I did exchange emails with the CEO,and
he explained the recent downdraft in sp as being due primarily to unloading of a restricted pp
News and updates in the near term
futr
I think Argentina, brines will be preferred over Chile.
Argentina's lithium ready for an inflection point-
https://oilprice.com/Alternative-Energy/Renewable-Energy/Lithium-Prices-Skyrocket-As-China-Cements-Leadership-Position.html
futr
EON MINERALS PRIVATE LIMITED
EON Minerals Private Limited is a Non-govt company, incorporated on 19 Oct, 2012. It's a private unlisted company and is classified as'company limited by shares'.
Company's authorized capital stands at Rs 1.0 lakhs and has 100.0% paid-up capital which is Rs 1.0 lakhs.
EON Minerals Private Limited is majorly in Mining & Quarrying business from last 10 years and currently, company operations are strike off. Current board members & directors are SUBODH KUMAR KALYANI and MANISH KUMAR KHATRI .
Company is registered in Jaipur (Rajasthan) Registrar Office. EON Minerals Private Limited registered address is TULSI CIRCLE BIKANER Bikaner RJ 334001 IN.
https://economictimes.indiatimes.com/company/eon-minerals-private-limited/U14200RJ2012PTC040445
Lorena Pérez Orta
R&D Leader at Door to Design, Inc. and Eon Minerals
Innovation and development (R&D) Leader
Door to Design, Inc. · Full-time
Oct 2018 - Present · 3 yrs 4 mos
Salta Province, Argentina
Responsible for the management, taking requirements, valuation, and planning of laboratory, bench, and pilot tests for the mining industry. Leadership and supervision of work teams. Direct interrelation with the client to solve incidents. Monitoring and control of the project. Responsible for the calculations for the balance of mass and energy, dimensioning, PFD, and datasheet of physical separation equipment, tanks, pumps. Drafting and review of technical documents, monthly reports.
Achievements: Acquisition of experience in the mining industry (lithium, gold, and silver), managing multiple activities simultaneously, and optimally coordinating technical teams. Technical determination of methodology to choose solid/liquid separation equipment. Simulation of a gold and silver plant at Metsim. Projects: Hombre Muerto Norte, NRG: Elaboration of the PEA. Mariana, Litio Minera Argentina LMA: Process engineer in the management and control of physical and chemical properties in evaporation and liming tests. Cerro Moro, Yamana Gold. Process engineer in the model and evaluation of the gold and silver plant. Salar Rincon, Rincon Lithium: Desktop study for the production of Li2CO3 through the conventional process and evaluation of lithium adsorption by fixed-bed column studies at an experimental level.
https://www.linkedin.com/in/lorena-p%C3%A9rez-orta-302a077a/
Additional 2,400 Hectares Acquired at Hombre Muerto
January 13, 2022 / Vancouver, BC / Lithium South Development Corporation (the “Company”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) is pleased announce it has acquired key ground situated near the Hombre Muerto North Lithium Project located in Salta Province, Argentina, on one of the world’s premium salars.
The Sophia I, II and III non-contiguous claim blocks are located approximately 5 kilometers north of the Alba Sabrina claim, and total 2,400 hectares. The areas will provide a potential water source and a location for anticipated future plant and processing facilities. This will eliminate the need for the Company to locate any future development on current salar locations.
https://www.lithiumsouth.com/posts/additional-2400-hectares-acquired-at-hombre-muerto/
To increase shareholder value, management intends to significantly expand the known resource with a drill program and further pumping wells. In addition, the Company will undertake a Feasibility Study using industry proven conventional evaporation and if warranted, Direct Lithium Extraction technology. Lithium South has approximately CDN$ 18 million in working capital and has an extensive advertising program planned to raise investor awareness by showcasing Lithium South’s exploration/development results.
Resource Expansion
The HMN Li Project is comprised of 3,287 hectares of which only the 383-hectare Tramo claim block has been drill tested. A recent TEM study has identified significant expansion potential over the balance of the claim blocks and in particular at the 2,089-hectare Alba Sabrina claim block. Drill permissions are expected in January 2022 and road as well as drill pad construction have already been initiated. A camp located near the project, has been contracted to house personnel and a drill contract is expected to be awarded this month.
futr
Lithium South Outlines 2022 Corporate Plan
January 6, 2022 / Vancouver, BC / Lithium South Development Corporation
Process Development
The current HMN Li Project resource located at the Tramo claim block is defined as 571,000 measured and indicated tonnes Lithium Carbonate Equivalent at 756 ppm Li, with a low Li to Mg ratio of 2.6:1 as reported on October 3, 2018, in a NI 43-101 report titled Initial Measured Lithium and Potassium Resource Estimate Homre Muerto Project, Salta and
Catamarca Provinces, Argentina, by Montgomery and Associates of Santiago Chile, with the author Qualified person Mr. Mike Rosko, M.Sc., C.P.G.
Eon Minerals of Salta, Argentina is currently performing conventional evaporation test work to produce battery grade lithium carbonate and confirm this industry standard lithium extraction process. In addition, three 2,000-liter bulk samples of this high-quality brine is awaiting laboratory test work by three DLE developers; Chemphys Chengdu located in Sichuan Province, China, Lilac Solutions of Oakland, California, and Eon Minerals of Salta Province, Argentina. Results from both conventional and DLE test work are expected over the coming weeks and will potentially define the optimal process for lithium production at the HMN Li Project
https://www.lithiumsouth.com/posts/lithium-south-outlines-2022-corporate-plan/
Brine mining is the wave of the future, and can be used to extract countless materials, from Lithium to silver, or silica from sand, it is the only way to extract the finest, purest lithium available, reducing cost later during the process of refining, adding value to the mining process.
It is also cheaper to liquid mine, than mechanical mine, once initial costs are covered. This also allows brine removal to be applied to piles of waste/scrap to extract material that can not be recovered mechanically, such as silver being removed from common slag piles at aprox 1oz.per ton for example.
Brine mining (think vinegar) is also environmentally safer than most chemicals used otherwise in the industry. This liquid mining process will be the norm some day for many mining operations and environmental cleanup tasks as well.
Partnered with high-purity Lithium battery producer in China – Chemphys –
http://www.chemphys.com/
futr
Let's see what they do with their next capital raise.
Exciting things to come.
Latest activities-
https://www.lithiumsouth.com/posts/environmental-base-line-study-update/
futr
https://www.lithiumsouth.com/wp-content/uploads/LISQ2021-Aug.pdf
Forgot the exact%
it's here somewhere ...a big stake though
futr
Do you know what % interest chemphys has in Lithium South? Got in at .35
The I-Box is a good start-
Huge lease
great partners-
successful neighbors-
tight share structure-
good luck-
futr
Been watching this for months, looks like she’s waking up. I do my own DD but if anyone could add I’d appreciate it.
I remember their previously announced approach
of trying at least 3 different processes including traditional solar evaporation,the lilac process,eon's? process,and chemphys' process
Interesting times in the lithium space
futr
Battery Grade Lithium Carbonate to be Produced at HMN Li Project
October 19, 2021 / Vancouver, BC / Lithium South Development Corporation (the “Company”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt: OGPQ) is pleased to announce that Eon Minerals of Miami Florida, through its laboratory located in Salta, Argentina, will be conducting test work to produce battery grade lithium carbonate from a bulk sample of brine to be recovered from the Hombre Muerto North Lithium Project (HMN Li Project), Argentina. Conventional process technology, based upon the proven evaporation extraction process of lithium will be utilized in this test phase.
The testing will begin with a pre-concentration process of 15 cubic meters of brine in ponds located at the project site. Work will include liming, solid-liquid separation, removal of boron through Solvent Extraction, polishing of the brine, precipitation of primary lithium carbonate, bi-carbonation, polishing of the brine by Ion Exchange, resulting in a targeted-battery grade lithium carbonate product. The process will also produce a lithium chloride solution with a targeted concentration up to 6% wt., which will be shipped to Chemphys Chengdu in China for further refinishing to their customer specifications.
https://www.lithiumsouth.com/posts/battery-grade-lithium-carbonate-to-be-produced-at-hmn-li-project/
The Chilean elections and lithium export bid process both currently impacting participants
The Maricunga Salar - Who're they gonna allow to operate in it ?
NeoLith IBAT Albermarle Bearing (to name but just a few)
There's been developing a Chilean Lithium Rush Month
Good info!
Thanks
futr
LITHIUM SOUTH Fri 10/8/2021 11:24 AM
Lithium South President Message
Dear Shareholders,
We are very pleased with the results of our recent TEM survey. As you can see from the map below, the Alba Sabrina block is large and holds significant potential to expand the current high quality lithium resource we have quantified at the Tramo claim block. Alba Sabrina is almost six times as large as Tramo. More news is pending next week.
Adrian F.C.Hobkirk
President and CEO
Lithium South
Aug 27 2021 Interim financial statements/report
https://sedar.com/DisplayCompanyDocuments.do?lang=EN&issuerNo=00008879
TEM Program Scheduled for HMN Li Project
Print Friendly, PDF & Email
August 05, 2021 / Vancouver, BC / Lithium South Development Corporation (the “Company”) (TSX-V: LIS) (OTCQB: LISMF) (Frankfurt OGPQ) is pleased to announce the engagement of Quantec Geoscience Argentina S.A., for the completion of a Time Domain Electromagnetic (TEM) program at the Hombre Muerto North Lithium Project, Salta Province, Argentina. Work to date has identified a measured and indicated lithium resource at the Tramo claim block, one of six areas contained in the project package. This program will cover the Alba Sabrina, Natalia Maria, Gaston Enrique, Norma Edit and Via Monte claim blocks, which have not been evaluated to date. The claim blocks are located adjacent to property under development or currently in lithium production. The northern claim groups border ground owned by POSCO (Korea), where a lithium mine is being constructed. The southern group adjoin ground owned by Livent, which is currently producing lithium from the area.
The TEM program is designed to provide hole location guidance for a planned 2,000-meter drill program, the intent of which is to expand the total project lithium resource, which is currently based only on the Tramo claim block. The TEM program will consist of 168 survey stations and will provide reliable and accurate survey data to compliment additional area information. The program is anticipated to take three weeks to complete.
The program is part of the Company development strategy for the Hombre Muerto North Lithium Project. Management is taking a fast-track approach to moving the project to a full feasibility study, with an Environmental Impact Report currently underway. Permissions to drill have been applied for and are expected in the immediate future. In addition, the Company is evaluating three types of Direct Lithium Extraction Technology (DLE) along with conventional evaporation extraction.
About Quantec Geoscience Argentina S.A.
Quantec Geoscience is a recognized leader in the industry, with experience spanning over 40 countries with over 5,000 geophysical projects. Quantec has considerable experience in the provision of geophysical services for the evaluation of salars in the Puna Region of Argentina.
About Lithium South
Lithium South is focused on developing the Hombre Muerto North Lithium Project (HMN Li Project), located on the Hombre Muerto Salar, a major lithium-producing salar in Argentina. The property is adjacent to land under development by the Korean multinational corporation POSCO, which acquired the ground from Galaxy Resources Ltd. for US $280 million. The Company completed a Preliminary Economic Assessment of the HMN Li Project in 2019, utilizing conventional evaporation extraction. The Company is focused on evaluating alternative extraction methods for the HMN Li Project and plans to become a leader in the application of Direct Lithium Extraction technology at the project level.
This news release has been reviewed by Marcela Casini, advisor of the Company and a Qualified Person as that term is defined in National Instrument 43-101.
On behalf of the Board of Directors
Adrian F. C. Hobkirk
President and Chief Executive Officer
Investors / Shareholders call 855-415-8100 / website: www.lithiumsouth.com
Everytime I slap a mosquito a bat goes hungry. lol
The butterfly effect. 90% of species on Earth have died off, and a new species takes its place.
Human kind may one day parish as well. And a new species shall take its place.
Followers
|
16
|
Posters
|
|
Posts (Today)
|
0
|
Posts (Total)
|
127
|
Created
|
11/08/17
|
Type
|
Free
|
Moderators |
Volume | |
Day Range: | |
Bid Price | |
Ask Price | |
Last Trade Time: |