Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.
$3B NPV *
—————— = $20 share price
146M shares
* requires the investment market to “buy into” the NPV, have faith and trust in the mgmt team’s ability to deliver well, and believe that high purity lithium will be in high demand through phase III.
BTW, Lithium demand is expected to grow by 500% from now through 2030. Lithium the commodity is projected to be near or at the bottom price.
Increases in Lithium prices appear to be uniformly significant through
2030.
Sounds promising! Especially combined with Century Lithium Corp’s more efficient and cost effective DLE process.
CYDVF has been shorted 60% over the past 5 days (source: ShortVolumes). Knowing the press release will give the PPS a boost (HUGE net present value gain), I imagine shorts have been busy covering today. I've taken advantage of the cheaper shares as I'm sure other longs have.
Thank you for posting the feasibility study highlights. Much appreciated.
$3 Billion Net Present Value
Currently at $80 million market cap
WOWZA !!!!!
4/29/24
Century Lithium Announces Positive Feasibility Study for the Clayton Valley Lithium Project, Nevada
FEASIBILITY STUDY HIGHLIGHTS
Large-Scale Nevada-based Lithium Project: three-phase production plan will generate a life-of-mine average of 34,000 tonnes per annum (tpa) of battery-quality lithium carbonate (Li2CO3)
Innovative Approach in Processing: patent-pending chloride leaching process combined with Direct Lithium Extraction (DLE), the Feasibility Study is supported by 2+ years of testing at the Company’s Pilot Plant
Mineral Resource Estimate: Measured and Indicated resources totaling 1,207.33 million tonnes (Mt) at an average grade of 957 parts per million (ppm) lithium (Li) containing 1.155 Mt of Li or 6.148 Mt of lithium carbonate equivalent (LCE)
Long 40-Year Mine Life: Proven and Probable Mineral Reserve Estimate totaling 287.65 Mt at an average grade of 1,149 ppm Li containing 0.330 Mt of lithium or 1.759 Mt of LCE
Initial Project: Phase 1 Capital Cost $1.537 billion for production capacity of 13,000 tpa LCE
Designed for Expansion: Phase 2 $0.651 billion for 28,000 tpa LCE, and Phase 3 $1.336 billion for 41,000 tpa LCE; Project expansions are capitalized with Project cash flow
Low Operating Cost: average operating cost $8,223/t of Li2CO3 produced, or $2,766/t after sales of surplus sodium hydroxide (NaOH)
After-tax IRR of 17.1% at $24,000/t Li2CO3: $3.01 billion after-tax net present value (NPV) at 8% discount rate and a 17.1% after-tax internal rate of return (IRR), using price assumptions of $24,000/t for Li2CO3 and $600/dry metric tonne (dmt) for NaOH
Nice. Looks like the company is coming out of the long slog to production. Much brighter days ahead.
Century Lithium Provides Update On The Feasibility Study
April 19, 2024 – Vancouver, Canada – Century Lithium Corp. (TSXV: LCE) (OTCQX: CYDVF) (Frankfurt: C1Z) (Century Lithium or Company) reports that the Feasibility Study on the Company’s Clayton Valley Lithium Project (Project), in Nevada, USA, under the direction of Wood PLC and Global Resource Engineering Ltd., is currently under review by the Qualified Persons, and the Company anticipates its announcement imminently.
To date, the Company’s Feasibility Study team has revised and updated estimates for a phased production approach at the Project. These revisions also included assessment and evaluation of the economic benefit of sales of the surplus sodium hydroxide produced by the chlor-alkali plant.
The Company’s Lithium Extraction Facility (Pilot Plant) in Amargosa Valley, Nevada is now in its third year of testing the processing of lithium-bearing claystone from the Project. All data collected has been essential to the Feasibility Study. Century Lithium continues to work toward permitting the Project including the collection of baseline data collection for biology, surface and groundwater hydrology, and social impacts. Earlier this year, baseline reports were submitted by the Company’s consultants and were accepted by the appropriate government agencies. Multiple reports have been completed which will aide in the preparation of a Plan of Operations to initiate the National Environmental Policy Act (NEPA) process.
About Century Lithium Corp.
Century Lithium Corp. (formerly Cypress Development Corp.) is an advanced stage lithium company, focused on developing its 100%-owned Clayton Valley Lithium Project in west-central Nevada, USA. Century Lithium is currently in the pilot stage of testing on material from its lithium-bearing claystone deposit at its Lithium Extraction Facility in Amargosa Valley, Nevada and progressing towards completing a Feasibility Study and permitting, with the goal of becoming a domestic producer of lithium for the growing electric vehicle and battery storage market.
ON BEHALF OF CENTURY LITHIUM CORP.
WILLIAM WILLOUGHBY, PhD., PE
President & Chief Executive Office
For further information, please contact:
Spiros Cacos | Vice President, Investor Relations
Direct: +1 604 764 1851
Toll Free: 1 800 567 8181
scacos@centurylithium.com
centurylithium.com
Century Lithium Reconfirms Production Of Battery Grade Purity Lithium Carbonate And Provides Update On Feasibility Study
May 25, 2023 – Vancouver, Canada – Century Lithium Corp. (TSXV: LCE) (OTCQX: CYDVF) (Frankfurt: C1Z) (Century Lithium or the Company) is pleased to report it has repeated the production of a high-purity lithium carbonate (Li2CO3) grading 99.87% with lithium-bearing claystone from the Company’s 100%-owned Clayton Valley Lithium Project (Project) in Nevada, USA. Several kilograms of the high purity Li2CO3were made from the intermediate lithium solutions generated in January at the Company’s Lithium Extraction Facility (Pilot Plant) in Amargosa Valley, Nevada. Following leaching and direct lithium extraction (DLE) at the Pilot Plant, solutions were shipped to Saltworks Technologies Inc. (Saltworks) where the final processing was completed.
“These results are in line with those we reported in September 2022, when we achieved a significant milestone in making lithium carbonate grading 99.94%” stated Bill Willoughby, President and CEO of Century Lithium. “The latest results confirm our ability to obtain a high purity lithium product with a low level of impurities from our claystone process.”
Century Lithium has now successfully repeated steps from test mining through to the manufacture of battery-grade Li2CO3. The table below is a comparison of the latest results with those from September 2022. Also shown, are the constituent levels for battery grade lithium carbonate as published by two major producers. The results for the Company’s lithium carbonate material assays were finalized by Saltworks and SGS Canada Inc.
Century Li2CO3
May 2023
Century Li2CO3
September 2022
Reference
Source 1
Reference
Source 2
Li2CO3 wt% 99.875 99.94 >99.5 >99.5
H2O wt% 0.03 0.01 <0.2 <0.5
Na wt% 0.047 0.02 <0.03 <0.05
Ca wt% 0.009 0.02 <0.01 <0.04
Fe Wppm 3 15 10 <5
Al Wppm <2 6 10 <10
Cu Wppm <4 <4 10 <5
Ni Wppm <5 <5 10 <6
Cl wt% 0.008% 0.008% <0.01% <0.01%
Scroll right to view more
Notes: wt% (weight percent), wppm (weight parts per million), calculated Li2CO3 purity based on sum of impurities measured above detection limit
Source 1 & 2: public company’s published composition of battery grade Li2CO3 ,
Feasibility Study Update
A Feasibility Study on the Project (Study) began in February 2022, with the engagement of Wood PLC as independent lead author. The Study has progressed well, with contributions from Global Resource Engineers, WSP USA Environment & Infrastructure Inc., and thyssenkrupp nucera, and with the support of Century Lithium’s personnel and consultants.
Major areas of the Study are completed and estimates for capital and operating cost estimates received, including those for the chlor-alkali plant portion of the Project. Wood is in the process of consolidating the estimates and reviewing them with Century, along with evaluating further optimization and opportunities for cost reductions. This optimization work will extend beyond the previously estimated mid-year completion date for the Study. The Company continues to focus on the Study and will provide updates in due course.
At the Pilot Plant, the collaboration of Century Lithium and Koch Technology Solutions (KTS) is underway testing the KTS Li-Pro™ process for DLE. Century Lithium personnel are working closely with KTS in the testing program, which has now completed its third 7-day cycle of operation. Thus far, the KTS process equipment has operated exceptionally well, using feed solution from the Pilot Plant, and the Company is very pleased with its performance.
Qualified Person
Todd Fayram, MMSA-QP and Daniel Kalmbach, CPG, are the qualified persons as defined by National Instrument 43-101 and have approved the technical information in this release.
About Century Lithium Corp.
Century Lithium Corp. (formerly Cypress Development Corp.) is an advanced stage lithium company, focused on developing its 100%-owned Clayton Valley Lithium Project in west-central Nevada, USA. Century Lithium is currently in the pilot stage of testing on material from its lithium-bearing claystone deposit at its Lithium Extraction Facility in Amargosa Valley, Nevada and progressing towards completing a Feasibility Study and permitting, with the goal of becoming a domestic producer of lithium for the growing electric vehicle and battery storage market.
ON BEHALF OF CENTURY LITHIUM CORP.
WILLIAM WILLOUGHBY, PhD., PE
President & Chief Executive Officer
For further information, please contact:
Spiros Cacos | Vice President, Investor Relations
Direct: +1 604 764 1851
Toll Free: 1 800 567 8181
scacos@centurylithium.com
centurylithium.com
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.
Cautionary Note Regarding Forward-Looking Statements
futr
Clayton Valley Lithium Highlights from Pre feasibility Report
26%Internal Rate of Return (after tax)
40+Years of Mine Life
27.4K
Average Annual Production of Battery- Quality Lithium Carbonate (Li2CO3)
$1.03B Net
The Final Feasibility Report due in less than 2 months will blow these numbers away
Projected Net Present Value between 2-3 billion dollars
100+ years of mine life
Share price can easily hit $15-20 in next 2 years.
Longs soon to be rewarded huge !
GLTA
Century Lithium is advancing the Clayton Valley lithium deposit towards a production decision
4 days ago Resource World
February 23,2023
By Ian Foreman
Century Lithium Corp. [LCE–TSXV; CYDVF-OTCQX] is a company on a mission – it is advancing its wholly owned Clayton Valley Lithium Project to a production decision as quickly as possible with the goal of becoming a domestic producer of lithium for the growing electric vehicle and battery storage market.
And this isn’t just wishful thinking… the 5,585 acre Clayton Valley Lithium Project, located in west-central Nevada, is host to a sizeable flat-lying deposit that is exposed at surface and continues to a depth of 467 feet. The probable mineral reserve totals 213 million tonnes with an average grade of 1,129 parts per million (‘ppm’) lithium using a cut-off grade of 900 ppm lithium and the indicated mineral resource totals 1,304 million tonnes with an average grade of 905 ppm lithium based on cut-off grade of 400 ppm lithium.
Their encouraging pre-feasibility study on the project indicated the potential for a 40-year mine life with an average mine production rate of 15,000 tonnes per day to produce 27,400 tonnes Lithium Carbonate Equivalent (“LCE”) annually. To further the potential economics the study showed a 25.8 % internal rate of return, and a capital cost payback of 4.4 years based on a lithium carbonate price of $9,500 per tonne.
Setting a frenetic pace
In order to reach a production decision as quickly as possible Century Lithium has set an aggressive schedule to advance their project. This includes continued testing of lithium-bearing claystone material at its lithium extraction facility while moving toward the completion of a feasibility study, which they anticipate having completed prior to Q3 2023.
With the anticipated favourable results of the feasibility study, the company plans to complete a Plan of Operations, begin the national environmental permitting process with the Bureau of Land Management, begin their environmental impact study, and begin state and local permitting processes – all prior to the end of 2023.
Should everything advance on schedule, they forecast that construction could begin as soon as the second half of 2025.
Refining the extraction process
The management of Century Lithium have tackled the challenges of being one of only three to advance a Nevada claystone lithium project to the feasibility stage head on. There wasn’t a roadmap as there is for the other commodities. As such they realized early on that they needed to get a handle on the recovery process(es) for lithium extraction. To that end they set up a lithium extraction facility, or pilot plant, which is located at del Sol Refining, approximately 125 miles south of their project. This pilot plant is providing essential data for the ongoing feasibility study and is now one of the largest, fully permitted and active lithium extraction facilities in North America. Since its start-up, the pilot plant has operated in 28 cycles of continuous 24/7 operation and has tested almost 10,000 samples of solutions, solids and precipitates.
In September of 2022 Century Lithium achieved a significant milestone when they successfully produced 99.94 % Li2CO3 (“lithium carbonate”), which not only surpasses the industry standard for battery grade lithium carbonate but achieves the standard for enhanced battery grade lithium carbonate for electric vehicle use.
Lithium battery manufactures will have specific requirements for lithium carbonate used in their products dependent on application. To that end, Century Lithium is producing marketing samples to support negotiations with potential offtake and strategic partners.
This month the company announced a continuation of its collaboration with Koch Technology Solutions, a Koch Engineered Solutions company, in the application of the Li-Pro™ process for direct lithium extraction. The Li-Pro™ process is made up a series of specialized separation processes for lithium extraction and refinement that produces a purified, concentrated lithium chloride product that is suitable for conversion to lithium carbonate or lithium hydroxide for use in battery production.
As part of the program, which is independent from the ongoing feasibility study, certain key components of the Li-Pro™ process will be tested at Century Lithium’s pilot plant. The information obtained from these new studies is anticipated to be included in the full-scale deployment of the Li-Pro™ process in the near future.
Feasibility Study and Environmental Considerations
The feasibility study on the project began in February 2022 and is advancing on schedule. The on-site infrastructure designs, including mine, processing plant, and tailings and waste storage facilities are completed. The cost estimation and market studies are underway as well as assessments for construction, component lead-time and off-site infrastructure. The updated resource and reserve estimates are scheduled to be the next completed tasks. These will then await the integration of the design, engineering and cost estimates for the chlor-alkali plant, which are also underway.
Mine planning relies on many complex factors with the environmental considerations of a future mine being of paramount importance. Water in Nevada is a limited resource and Century Lithium owns water rights in Clayton Valley that will provide a majority of the project’s future water requirements. A vast majority of the water will be used in the processing of the lithium bearing claystones. The Li-ProTM process that is being implemented in the pilot plant optimizes water usage and will minimize the amount of water required. In addition to this, the Pilot Plant has successfully operated using 100% recycled solutions.
The foresight of management doesn’t stop at working to source and limit its water use; in a move to anticipate the future requirements for power, the company is helping mitigate its future energy requirement by purchasing a geothermal lease in the Clayton Valley and is currently pursuing options for solar power generation near the project. Infrastructure surrounding the project is good as the property lies immediately east of Albemarle’s (ALB – NYSE) Silver Peak mine, North America’s only lithium brine operation.
So, all the pieces seem to be falling into place for Century Lithium – the deposit has robust economics, a feasibility study is nearing completion, and it seems that a production decision is on the horizon. The market reacted very positively to their recent name change, from Cypress Development, as it better reflects the company, it’s project and its vision.
Are the stars aligned for Century Lithium to become North America’s first producer of lithium from claystone? Well, if management has anything to do with it, their diligence will be paid off in spades.
Thanks......I was wondering
Up 9pct to 1.19
https://bigcharts.marketwatch.com/advchart/frames/frames.asp?show=&insttype=&symb=ca%3Alce&x=0&y=0&time=100&startdate=2%2F4%2F2020&enddate=2%2F19%2F2023&freq=1&compidx=aaaaa%3A0&comptemptext=&comp=none&ma=0&maval=9&uf=0&lf=1&lf2=0&lf3=0&type=2&style=320&size=3&timeFrameToggle=false&compareToToggle=false&indicatorsToggle=false&chartStyleToggle=false&state=9
Cypress Development Corp. changed to Century Lithium Corp.:
https://otce.finra.org/otce/dailyList?viewType=Symbol%2FName%20Changes
NEWS RELEASE
Cypress Development Changes Name to Century Lithium Corp and New Ticker Symbol ‘LCE’ Effective January 30, 2023
January 26, 2023 – Vancouver, Canada – Cypress Development Corp. (TSXV: CYP) (OTCQX: CYDVF) (Frankfurt: C1Z1) (“Cypress” or “the Company”) is pleased to announce that further to its news release dated January 24, 2023, the TSX Venture Exchange (the “TSXV”) has approved the Company’s name change from Cypress Development Corp. to Century Lithium Corp. The Company will also change its trading symbol from ‘CYP’ to ‘LCE’ on the TSXV. The effective date on which the Company will begin trading under the new name and symbol is January 30, 2023. The CUSIP number is 156615106.
The transfer agent of the Company continues to be Computershare Investor Services Inc. There is no change in the capitalization of the Company in connection with the change of name and trading symbol and no action is required by existing shareholders with respect to this matter. Shareholders holding share certificates of the Company can request a replacement certificate, however new certificates are not required and will not be automatically issued.
About Cypress Development Corp
Cypress Development Corp. is a Canadian based advanced stage lithium company, focused on developing its 100%-owned Clayton Valley Lithium Project in Nevada, USA. Cypress is in the pilot stage of testing on material from its lithium-bearing claystone deposit and progressing towards completing a Feasibility Study and permitting, with the goal of becoming a domestic producer of lithium for the growing electric vehicle and battery storage market.
ON BEHALF OF CYPRESS DEVELOPMENT CORP.
WILLIAM WILLOUGHBY, PhD., PE
President & Chief Executive Officer
For further information, please contact:
Spiros Cacos | Vice President, Investor Relations
Direct: +1 604 764 1851 | Toll Free: 1 800 567 8181
Email scacos@cypressdevelopmentcorp.com
www.cypressdevelopmentcorp.com
NEWS RELEASE
Cypress Development To Change Name To Century Lithium Corp
January 24, 2023 – Vancouver, Canada – Cypress Development Corp. (TSXV: CYP) (OTCQX: CYDVF) (Frankfurt: C1Z1) ( “Cypress” or “the Company”) announces that the Board of Directors has approved a name change of the Company from Cypress Development Corp. to Century Lithium Corp.
The Company will also change the ticker symbol upon which it trades on the TSX Venture Exchange (“TSXV”). The Company will issue a further news release announcing the date that trading under the new name, symbol and CUSIP number will commence. The name change remains subject to TSXV approval.
About Cypress Development Corp
Cypress Development Corp. is a Canadian based advanced stage lithium company, focused on developing its 100%-owned Clayton Valley Lithium Project in Nevada, USA. Cypress is in the pilot stage of testing on material from its lithium-bearing claystone deposit and progressing towards completing a Feasibility Study and permitting, with the goal of becoming a domestic producer of lithium for the growing electric vehicle and battery storage market.
ON BEHALF OF CYPRESS DEVELOPMENT CORP.
WILLIAM WILLOUGHBY, PhD., PE
President & Chief Executive Officer
For further information, please contact:
Spiros Cacos | Vice President, Investor Relations
Direct: +1 604 764 1851 | Toll Free: 1 800 567 8181 | Email scacos@cypressdevelopmentcorp.com
www.cypressdevelopmentcorp.com
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.
View in PDF Format
Follow Cypress Development Corp.
Cypress Development Corp.
NEWS RELEASE
Cypress Development Provides Progress Update On Feasibility Study And Lithium Extraction Facility
January 23, 2023 – Vancouver, Canada – Cypress Development Corp. (TSXV: CYP) (OTCQX: CYDVF) (Frankfurt: C1Z1) (“Cypress” or “the Company”) is pleased to provide a progress update on its ongoing Feasibility Study being conducted on the Company’s Clayton Valley Lithium Project (“Project”) near Silver Peak, Nevada, and on its operational Lithium Extraction Facility (“Pilot Plant”) in Amargosa Valley, Nevada.
Highlights
The Pilot Plant continues to function as designed, working to optimize the Project’s flowsheet. The Plant leaches lithium-bearing claystone material, through to the production of concentrated lithium solution using the Company’s Direct Lithium Extraction (“DLE”) process.
Additional piloting runs will take place at Saltworks Technologies, Inc. following the successful production of lithium carbonate (“Li2CO3”) from the Pilot Plant’s concentrated lithium solutions.
The Project’s Feasibility Study is on schedule and is continuing to advance toward an anticipated second quarter 2023 completion.
Arrangements are proceeding to initiate federal, state, and local permitting for the Project, with compilation of data and evaluation of related infrastructure, including access, water, and power supply corridors.
Ahead of the Feasibility Study and permitting, Cypress management is assessing personnel needs and future Project financing opportunities and structures, which may include government grants and loans.
Pilot Plant
Cypress continues to conduct testing at its Pilot Plant with the support of del Sol Refining, Inc. Since its start-up, the Pilot Plant has operated in 28 cycles of continuous 24/7 operation, with minimal down-time and maintenance matters. The test work was conducted using multiple configurations and equipment to best replicate the Project flowsheet. In the testing to date, nearly 10,000 samples of solutions, solids and precipitates have been collected and analyzed. Other data collection, including recording of flow rates and physical conditions at key sample points throughout the Pilot Plant, has been conducted, with particular attention to the DLE section of the Pilot Plant to develop the Project’s mass-balance calculations, and to finalize the flowsheet for the Feasibility Study.
Pilot Plant testing has achieved targets in most areas, including operating with 100% recycled solutions. Specific challenges were addressed with sufficient results to aid in the completion of the Feasibility Study. Further testing in 2023 is planned to confirm the overall process, continue to demonstrate the flowsheet, and produce samples of Li2CO3. Additional 1000-liter lots of concentrated lithium solution from the DLE section of the Pilot Plant will be shipped to Saltworks Technologies, Inc, in Richmond, B.C., Canada by month end.
2023 plans for the Pilot Plant include testing alternate reagents and equipment, which may include identification of potential by-products, and ways to enhance impurity removal and the DLE process area. Additional space within the Pilot Plant building has been prepared for this work.
Feasibility Study
The Feasibility Study is advancing on schedule, with completion anticipated by mid-year. On-site infrastructure designs, including, mine, processing plant, and tailings and waste storage facilities are completed. Cost estimating and market studies are underway, along with assessments for construction, component lead-time and off-site infrastructure. Completion of the Feasibility Study will then await integration of the design and cost estimates for the acid plant underway by thyssenkrupp nucera.
In addition, Cypress management is assessing personnel needs and future Project financing opportunities and structures, which may include government grants and loans.
About Cypress Development Corp
Cypress Development Corp. is a Canadian based advanced stage lithium company, focused on developing its 100%-owned Clayton Valley Lithium Project in Nevada, USA. Cypress is in the pilot stage of testing on material from its lithium-bearing claystone deposit and progressing towards completing a Feasibility Study and permitting, with the goal of becoming a domestic producer of lithium for the growing electric vehicle and battery storage market.
ON BEHALF OF CYPRESS DEVELOPMENT CORP.
WILLIAM WILLOUGHBY, PhD., PE
President & Chief Executive Officer
For further information, please contact:
Spiros Cacos | Vice President, Investor Relations
Direct: +1 604 764 1851 | Toll Free: 1 800 567 8181 | Email scacos@cypressdevelopmentcorp.com
www.cypressdevelopmentcorp.com
NEITHER THE TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THE CONTENT OF THIS NEWS RELEASE.
View in PDF Format
Follow Cypress Development Corp.
Cypress Development Provides Progress Update On Feasibility Study And Lithium Extraction Facility
January 23, 2023 – Vancouver, Canada – Cypress Development Corp. (TSXV: CYP) (OTCQX: CYDVF) (Frankfurt: C1Z1) (“Cypress” or “the Company”) is pleased to provide a progress update on its ongoing Feasibility Study being conducted on the Company’s Clayton Valley Lithium Project (“Project”) near Silver Peak, Nevada, and on its operational Lithium Extraction Facility (“Pilot Plant”) in Amargosa Valley, Nevada.
Highlights
The Pilot Plant continues to function as designed, working to optimize the Project’s flowsheet. The Plant leaches lithium-bearing claystone material, through to the production of concentrated lithium solution using the Company’s Direct Lithium Extraction (“DLE”) process.
Additional piloting runs will take place at Saltworks Technologies, Inc. following the successful production of lithium carbonate (“Li2CO3”) from the Pilot Plant’s concentrated lithium solutions.
The Project’s Feasibility Study is on schedule and is continuing to advance toward an anticipated second quarter 2023 completion.
Arrangements are proceeding to initiate federal, state, and local permitting for the Project, with compilation of data and evaluation of related infrastructure, including access, water, and power supply corridors.
Ahead of the Feasibility Study and permitting, Cypress management is assessing personnel needs and future Project financing opportunities and structures, which may include government grants and loans.
Pilot Plant
Cypress continues to conduct testing at its Pilot Plant with the support of del Sol Refining, Inc. Since its start-up, the Pilot Plant has operated in 28 cycles of continuous 24/7 operation, with minimal down-time and maintenance matters. The test work was conducted using multiple configurations and equipment to best replicate the Project flowsheet. In the testing to date, nearly 10,000 samples of solutions, solids and precipitates have been collected and analyzed. Other data collection, including recording of flow rates and physical conditions at key sample points throughout the Pilot Plant, has been conducted, with particular attention to the DLE section of the Pilot Plant to develop the Project’s mass-balance calculations, and to finalize the flowsheet for the Feasibility Study.
Pilot Plant testing has achieved targets in most areas, including operating with 100% recycled solutions. Specific challenges were addressed with sufficient results to aid in the completion of the Feasibility Study. Further testing in 2023 is planned to confirm the overall process, continue to demonstrate the flowsheet, and produce samples of Li2CO3. Additional 1000-liter lots of concentrated lithium solution from the DLE section of the Pilot Plant will be shipped to Saltworks Technologies, Inc, in Richmond, B.C., Canada by month end.
2023 plans for the Pilot Plant include testing alternate reagents and equipment, which may include identification of potential by-products, and ways to enhance impurity removal and the DLE process area. Additional space within the Pilot Plant building has been prepared for this work.
Feasibility Study
The Feasibility Study is advancing on schedule, with completion anticipated by mid-year. On-site infrastructure designs, including, mine, processing plant, and tailings and waste storage facilities are completed. Cost estimating and market studies are underway, along with assessments for construction, component lead-time and off-site infrastructure. Completion of the Feasibility Study will then await integration of the design and cost estimates for the acid plant underway by thyssenkrupp nucera.
In addition, Cypress management is assessing personnel needs and future Project financing opportunities and structures, which may include government grants and loans.
About Cypress Development Corp
Cypress Development Corp. is a Canadian based advanced stage lithium company, focused on developing its 100%-owned Clayton Valley Lithium Project in Nevada, USA. Cypress is in the pilot stage of testing on material from its lithium-bearing claystone deposit and progressing towards completing a Feasibility Study and permitting, with the goal of becoming a domestic producer of lithium for the growing electric vehicle and battery storage market.
ON BEHALF OF CYPRESS DEVELOPMENT CORP.
WILLIAM WILLOUGHBY, PhD., PE
President & Chief Executive Officer
For further information, please contact:
Spiros Cacos | Vice President, Investor Relations
Direct: +1 604 764 1851 | Toll Free: 1 800 567 8181 | Email scacos@cypressdevelopmentcorp.com
Up 12 cents today on Canadian market
Cypress Development Corp
CVE: CYP
1.13 CAD +0.12 (11.88%)today
Jan 16, 1:51?PM EST
Cypress Development Confirms Production Of Battery Grade Lithium Carbonate
(Futrcash, you tried to show me)
NEW YEARS NEWSLETTER
Cypress enjoyed a very productive year in 2022, thanks to the hard work of our staff, consultants, and contractors. We will take a moment to recall some of the accomplishments of 2022 and through this, anticipate what the year ahead will bring.
A major focus of Cypress’ in 2022 was the operation of the Company’s Lithium Extraction Facility, aka our Pilot Plant, in Amargosa Valley which operated throughout the year. Completed in 2021, the Pilot Plant gathered data for our ongoing Feasibility Study and tested various operating conditions and
changes in equipment and flow sheet, all while performing safely. During the year, the Pilot Plant completed 24 distinct cycles of 24-hour-per-day continuous testing.
Financing is a key to success. A financing in early 2021 enabled Cypress to acquire critical water rights and complete the design, acquisition and assembly of the Pilot Plant. In early 2022 the Company expanded its cash position by adding C$18.1 million to the treasury. The addition was timely given the
trying year experienced by junior companies.
With a strong position, we were able to add to our land position in Clayton Valley through the acquisition of Enertopia’s adjacent project. We were also fully funded to continue work at the Pilot Plant and proceed with a Feasibility Study, ongoing since March, under the direction of international consulting firm Wood Plc.
Cypress completed its license purchase agreement with Chemionex for DLE technology, which is a key component of the Pilot Plant. Using chloride leaching along with DLE, our process team successfully produced concentrated lithium solutions from which Saltworks Technologies produced 99.94% pure
lithium carbonate. This milestone shows we can produce +99.5% “battery-grade” lithium carbonate using material from the Project and represents a major achievement by the team and our technology.
To complete a key part of the process, we engaged thyssenkrupp nucera for the Feasibility design of the Chlor-alkali plant. Their engagement was secured late in the year and based on their experience in both designing and constructing CA plants, bringing us a step closer to a future lithium operation and a Feasibility Study which we expect to complete in the first half of this year.
Throughout 2022, we introduced the Company to prospective investors in different markets and were encouraged by the level of interest for a U.S. lithium project at Cypress' stage. The team also reviewed business opportunities that could contribute to the growth of the company, including alternative energy
solutions, but with a firm focus on the Project through testing and feasibility related studies.
In the year ahead, we look forward to continued progress with completion of the Feasibility Study and advancing the Project through permitting. At the Pilot Plant we remain focused on data generation to validate the process and make improvements to test equipment and alternate processing conditions
that could have impact on the Project and potential future partners or clients.
We are grateful for the support and hard work of our team and shareholders, and we look forward to continuing our progress into 2023 and beyond.
- Dr. Bill Willoughby
President & CEO
Well, as soon as I learned that they were on Steveston and Number 6 Road......(a little less than a mile from my childhood home), I couldn't help but adopt just a bit stronger interest......considering that that was cow pasture all whilst I "grew up" (that's if one can say that I did)......I'm not sure.
.
Thank you, Nowwhat2, I too have noticed Saltworks. But, you did much earlier. They have been working with many lithium companies.
saltworks
https://www.saltworkstech.com/technology/
Better stick to charts.
Its the refining process they have been working on. o__0
Their is a new Dogg in town.
Koch and Patents Assigned to ENERGYSOURCE MINERALS LLC
https://patents.justia.com/assignee/energysource-minerals-llc
futrcash started the dd I added to it.
https://investorshub.advfn.com/boards/read_msg.aspx?message_id=170033333
I'm skeptical (aren't you ?) that a company operating out of a Steveston Highway (and Number 6 Road "warehouse") has succeeded in extracting scalable volumes of LiOH for both Standard and Now Cypress Developments.
One question I'd ask is how come it's taken this long to announce that positive extraction results have been attained.......
Like, couldn't Cypress have sent to Saltworks a bunch of samples years ago .?
Or, something along those lines.
Also how come Standard Lithiums' share price has been sinking if Saltworks' technology IS a viable solution ?
Year 2020
https://www.saltworkstech.com/news/saltworks-scores-a-lithium-hat-trick/
2022
https://www.saltworkstech.com/news/lithium-nickel-crystallizers-ev-batteries/
PS : Naturally, I'm not a "technologist" so I AM basically concluding things cluelessly.
.
.
Share Structure
Issued & Outstanding 146.5 M
Warrants 21.1 M
Options 6.8 M
Fully Diluted 174.5 M
https://cypressdevelopmentcorp.com/investors/related-websites/
Cypress Development confirms production of battery-grade lithium carbonate
1,301 views Sep 19, 2022
Saltworks is located within 1 mile of my childhood familys' home
They've now conducted brine pilots for both Standard and Cypress ?
https://www.google.ca/search?q=standard+lithium+saltworks&sxsrf=ALiCzsarcdQBT3TeBAVxAoXuRWPCqeYs2A%3A1664201748197&source=hp&ei=FLQxY9ydCZeB0PEP7sOhwAc&iflsig=AJiK0e8AAAAAYzHCJCiOhGh-FigEhkZJ8xdku3hyHtJV&ved=0ahUKEwjc96HQ0rL6AhWXADQIHe5hCHgQ4dUDCAk&uact=5&oq=standard+lithium+saltworks&gs_lcp=Cgdnd3Mtd2l6EAMyBQghEKABMgUIIRCgAToECCMQJzoLCAAQgAQQsQMQgwE6FAguEIAEELEDEIMBEMcBENEDENQCOhEILhCABBCxAxCDARDHARDRAzoOCC4QgAQQsQMQxwEQ0QM6CAguEIAEELEDOgsILhCABBDHARCvAToFCAAQgAQ6DggAEIAEELEDEIMBEMkDOgUIABCSAzoOCC4QgAQQsQMQxwEQrwE6DgguEIAEEMcBEK8BENQCOggILhCxAxCDAToICAAQsQMQgwE6EQguEIAEELEDEIMBEMcBEK8BOgsILhCABBCxAxDUAjoLCC4QsQMQxwEQrwE6BQguEIAEOgsILhCABBDHARDRAzoGCAAQHhAWOgUIABCGAzoHCCEQoAEQCjoECCEQFVAAWMlMYK9uaABwAHgAgAFniAG-DpIBBDI1LjGYAQCgAQE&sclient=gws-wiz
https://www.google.ca/search?q=standard+lithium+saltworks+cypress&sxsrf=ALiCzsZqGMNIXmYq8gspdZEvStYTAm9kSw%3A1664201764715&ei=JLQxY9uiK6Oy0PEP-JKNkAs&ved=0ahUKEwjbxJTY0rL6AhUjGTQIHXhJA7IQ4dUDCA4&oq=standard+lithium+saltworks+cypress&gs_lcp=Cgdnd3Mtd2l6EAwyBQghEKABMgUIIRCgATIFCCEQoAE6CggAEEcQ1gQQsAM6BwghEKABEApKBAhBGABKBAhGGABQhhBY_ztg92NoAnABeACAAYQBiAGGBpIBAzUuM5gBAKABAcgBCMABAQ&sclient=gws-wiz
https://bigcharts.marketwatch.com/advchart/frames/frames.asp?show=&insttype=&symb=ca%3Asli&x=57&y=19&time=100&startdate=2%2F4%2F2020&enddate=11%2F19%2F2022&freq=1&compidx=aaaaa%3A0&comptemptext=&comp=none&ma=0&maval=9&uf=0&lf=1&lf2=0&lf3=0&type=2&style=320&size=3&timeFrameToggle=false&compareToToggle=false&indicatorsToggle=false&chartStyleToggle=false&state=9
https://bigcharts.marketwatch.com/advchart/frames/frames.asp?show=&insttype=&symb=ca%3Acyp&x=14&y=14&time=100&startdate=2%2F4%2F2020&enddate=11%2F19%2F2022&freq=1&compidx=aaaaa%3A0&comptemptext=&comp=none&ma=0&maval=9&uf=0&lf=1&lf2=0&lf3=0&type=2&style=320&size=3&timeFrameToggle=false&compareToToggle=false&indicatorsToggle=false&chartStyleToggle=false&state=9
I dunno........but my spidey senses are just tingling a bit, that's all.
.
.
Awesome news !!!!!
We have battery grade lithium !!!!!!
CYPRESS DEVELOPMENT CONFIRMS PRODUCTION OF BATTERY GRADE LITHIUM CARBONATE
https://finance.yahoo.com/news/cypress-development-confirms-production-battery-100000399.html
HUGE-"Maybe this will move the needle"... .9994 LITHIUM CARBONATE FROM CLAY!
Chico
Updated Corporate Presentation
https://cypressdevelopmentcorp.com/site/assets/files/3567/cypress_development_presentation_-_august.pdf
futr
Once report hits confirming battery grade lithium we fly!
Cypress is moving up big today!!
Up .16 to .97
19.75%
News is outstanding -
Cypress Development Progress on Feasibility Study
June 15, 2022 – Vancouver, Canada – Cypress Development Corp. (TSXV: CYP) (OTCQX: CYDVF) (Frankfurt: C1Z1) (“Cypress” or “the Company”) is pleased to provide an update on the progress of the ongoing Feasibility Study for the Company’s Clayton Valley Lithium Project, in Nevada, USA. The Feasibility Study is under the direction of Wood PLC ("Wood") and Global Resource Engineering (“GRE”) and all related work is proceeding well, and it remains on track for completion in late 2022.
Activity Highlights:
Geotechnical study in progress
Continued operation of the Pilot Plant
500-ton bulk sample collected for further metallurgical material
Sonic drill program completed consisting of 580 meters in eight drill holes
Resource model updated with data from recently acquired property
Geotechnical Program
Wood personnel conducted on-site visits in supervising the collection of geotechnical data for the foundation design of the Company’s processing plant site and tailings storage facility. The samples collected for Wood’s geotechnical program were shipped to materials testing laboratories, and additional on-site work is planned in the next month.
GRE personnel conducted site visits in preparation to work on the Project’s resources and reserves. GRE personnel supervised the collection of a suite of large-diameter core samples for assay and geotechnical testing, which will provide further information for GRE’s work on the mine design.
Lithium Extraction Facility (“Pilot Plant”)
Testing continues at Cypress’ Pilot Plant in Amargosa Valley, 100 miles southeast of the Clayton Valley Lithium Project site. The Pilot Plant is now working in its 12th cycle of continuous 24-hr per day testing. The tests are ongoing to examine efficiencies in processing, testing various configurations in equipment and operating conditions, and the plant continues to produce concentrated lithium solutions for use in downstream product testing.
Wood’s process engineering team is working with Continental Metallurgical Services and the data from the Pilot Plant, to develop mass balance and equipment sizing. Wood’s engineers are also working on the overall project infrastructure, including selection and design of access roads, plant equipment, power, and water supplies.
Bulk Sample
To support continued testing, a 500-tonne sample of claystone was excavated in late April from an engineered test-pit and transported to the Company’s operations headquarters at the Tonopah airport, where it will be crushed, screened, and bagged in preparation for treatment at the Company’s Pilot Plant. The sample was collected near DCH-1, and in the vicinity of the planned starter-pit for mining in the Feasibility Study.
“We are pleased with the bulk sampling work. The size of the bulk sample may be larger than necessary for the Pilot Plant to provide adequate information for the Feasibility Study” said President and CEO Bill Willoughby. “This sample, however, allows us to examine lithium grade and other properties in the claystone over a larger volume. It also ensures we have material on hand, should we need it, for future tests or continued operations.”
Sonic Drill Program
Cypress is continuing to log and sample core from a sonic drill program which commenced and was completed in May. The purpose of the drill program was to obtain large-diameter (6-inch) continuous core. Eight locations were selected for metallurgical, geotechnical, lithological purposes. Each hole yielded 1.9 to 2.3 tonnes of claystone which will be used in metallurgical testing at the Company’s Pilot Plant to examine if there are any variations in performance due to depth, location, or material type in the deposit.
Four of the holes (CSV-1 through CVS-4) were completed in the central portion of the project in the vicinity of the proposed starter-pit and the 500-tonne bulk sample. Four other holes (CVS-5 through CVS-8) were completed in the northeast portion of the project on and near the parcel of property recently acquired from Enertopia Corporation (“Enertopia”). In addition to providing metallurgical sample material, these latter four holes will provide confirmation of the data from Enertopia’s previous drilling.
“The drilling program proceeded better than expected and was very successful in this first application of sonic drilling in Clayton Valley” stated Daniel Kalmbach, Cypress Manager, Geology and QP. “The quality of the large-diameter core samples are excellent and will provide further valuable data for the Feasibility Study.”
Resource Model
The recent addition of land acquired from Enertopia (see news release dated May 5, 2022) resulted in the addition of five core holes which were drilled by Enertopia in 2018. This property comprises 17 unpatented mining claims totaling 160 contiguous acres immediately adjacent to Cypress’s Project. A March 2020 NI 43-101 compliant technical report (published by Enertopia) on the property shows an Indicated resource of 82 million tonnes (mt) of 1,121 parts per million (ppm) Li and an Inferred resource of 18 mt of 1,131 ppm Li using a cutoff grade of 400 ppm Li. Cypress has not independently confirmed the resource indicated in the March 2020 NI 43-101 report.
All data received from the property acquisition has been incorporated into the project database and is expected to be used by GRE to generate the resource and reserve estimates and develop the mine plan for the Feasibility Study
Qualified Person
Daniel Kalmbach, CPG, is the qualified persons as defined by National Instrument 43-101 and have approved of the technical information in this release.
About Cypress Development Corp
Cypress Development Corp. is a Canadian based advanced stage lithium company, focused on developing its 100%-owned Clayton Valley Lithium Project in Nevada, USA. Cypress is in the pilot stage of testing on material from its lithium-bearing claystone deposit and progressing towards completing a feasibility study and permitting, with the goal of becoming a domestic producer of lithium for the growing electric vehicle and battery storage market.
ON BEHALF OF CYPRESS DEVELOPMENT CORP.
WILLIAM WILLOUGHBY, PhD., PE
President & Chief Executive Officer
For further information, please contact:
Spiros Cacos | Vice President, Investor Relations
Direct: +1 604 764 1851 | Toll Free: 1 800 567 8181 | Email scacos@cypressdevelopmentcorp.com
www.cypressdevelopmentcorp.com
Cypress moving back up -appears tons of support at a dollar now.
The report to confirm the pilot plant produced battery grade lithium is due sometime by end of June or early July.
The Final Feasibility Study to update new value of the mine is due end of the year or early next.
Wait till the masses find out this is worth $10-15 BILLION PLUS and currently has a market cap of roughly 150 million.
$10-20 coming here in next year- but you gotta be in it to win.
5+ years holding this gem and adding when I can !
GLTA
Cypress Development Corporate Presentation from Noble Capital Markets' recent investor conference: https://channelchek.com/news-channel/Cypress_Development__CYDVF__NobleCon18_Presentation_Replay_
They do have the water rights locked up.
This will be 5-10 bucks by years easy and like most of the hot lithium stocks really isn’t a chart play. When news drops this will run dollars for days- no chart line or RSI will stop it.
Been here since 15 cents and will be here when it hits $15-20
GLTA
Broke the uptrend line on the 2 year chart. Going to try and retest that line, then sell off. 4 months of water rights does you no good if you can't replace it.
Cypress having ANOTHER huge day !
Up 17 cents right now and 12%
Absolutely agree !!!
Big payday coming to longs - just gotta hang in there for final feasibility report due before years end.
Should definitely climb up before that and skyrocket thereafter.
GLTA
This is outstanding news, and finally getting the water issue resolved. The plant and processes looking good, things are shaping up very nicely.
Elon Musk Could Pair Up With One Of These Lithium Miners: Cypress Development Or Lithium Americas
Apr. 11, 2022 11:52 AMALB, AMRZF, HXLTF
Summary
Elon Musk comments on lithium and how Tesla might enter "mining and refining directly at scale".
Cypress Development and Lithium Americas are top logical contenders to pair up with.
Cypress buys out neighbor's lithium project and announced favorable pilot plant results. In other news --- Water rights are fully secured.
What impact will this have on Cypress Development's resources and NPV?
If Albemarle is the king of Clayton Valley, then Cypress is the Prince; The prince shall have his day.
Elon Musk Visits Germany
Maja Hitij/Getty Images News
Elon Musk made some rather interesting comments today via Twitter (TWTR) in reference to Tesla (TSLA) possibility entering the lithium market AND the lithium refining market.
Elon Musk comments on lithium (Yellow highlights are the authors) (Elon Musk via Twitter)
Now of course the most logical choices are lithium projects near the Gigafactory near Reno, Nevada. That leaves us with a few contenders for Musk to possibly buyout or team up with in some fashion. Remember the projects have to have water rights and be somewhat close to receiving permits or already have them.
I'm also excluding any that have existing partnerships and / or problems with permits due to endangered plants. This excludes various contenders. I am only going to list the most logical choices. This leaves us with Cypress Development (OTCQB:CYDVF) and Lithium Americas (NYSE:LAC).
Rumors of Tesla Trying to Buy Cypress Development
First, we need to remember that Elon Musk had previously commented during the 2019 shareholders meeting about getting into lithium:
Might get into the business of mining minerals used in electric vehicle batteries. - Elon Musk
Then in 2020, Tesla was rumored to have been looking to acquire Cypress Development but the deal was never consummated. Per Businessinsider.com:
Tesla was recently holding acquisition talks with a Nevada-based mining company to advance its ambitious plan to source lithium from clay deposits in the US, but the electric-car company was unable to reach a deal and has since secured the rights needed to legally mine the raw material on its own in the state, Bloomberg's Yvonne Yue Li and David Stringer reported Monday.
The mining of lithium is a key part of Elon Musk's vision for Tesla's future manufacturing process as the Tesla CEO looks to scale up his supply chain in pursuit of less-expensive and longer-lasting batteries. Musk has said that doing so will give the company a competitive advantage as electric cars become increasingly common. He also has said it will cut costs and enable a $25,000 Tesla to be built and sold.
Cypress Development Reports Water Rights Petition Dismissed
April 11, 2022Print This Page
Related Document
View PDF
April 11, 2022 – Vancouver, Canada – Cypress Development Corp. (TSXV: CYP) (OTCQX: CYDVF) (Frankfurt: C1Z1) ( “Cypress” or “the Company”) is pleased to report the Company has been informed that the petition for judicial review of the Nevada State Engineer’s extension of Water Right Permit 44411 and Certificate 13631 (the “Permit”) was dismissed with prejudice by the Fifth Judicial Court of Esmeralda County, Nevada.
The Company acquired the Permit from Intor Resources Corporation (“Intor”), a subsidiary of Nevada Sunrise Gold Corp., for use at the Company’s Clayton Valley Lithium Project, in Nevada (see news release dated December 8, 2021). The Permit allows for the appropriation of the public waters of the State of Nevada in the amount of 1,770 acre-feet of groundwater per year for mining, milling and domestic use. This amount represents the largest single volume of permitted water available in the Clayton Valley, which is a fully appropriated hydrogeographic basin.
Intor submitted an Application for Extension of Time to Prevent Forfeiture of the Permit on July 29, 2021. The extension was approved by the State Engineer on November 2, 2021. With the court order, the State Engineer’s approval is final and binding, and the extension is valid until August 28, 2022.
About Cypress Development Corp
Cypress Development Corp. is a Canadian based advanced stage lithium company, focused on developing its 100%-owned Clayton Valley Lithium Project in Nevada, USA. Cypress is in the pilot stage of testing on material from its lithium-bearing claystone deposit and progressing towards completing a Feasibility Study and permitting, with the goal of becoming a domestic producer of lithium for the growing electric vehicle and battery storage market.
ON BEHALF OF CYPRESS DEVELOPMENT CORP.
WILLIAM WILLOUGHBY, PhD., PE
President & Chief Executive Officer
For further information, please contact:
Spiros Cacos | Vice President, Investor Relations
D: +1 604 764 1851 | Toll : 1 800 567 8181 | scacos@cypressdevelopmentcorp.com
www.cypressdevelopmentcorp.com
New Corporate Presentation
https://cypressdevelopmentcorp.com/site/assets/files/3567/cypress_development_presentation_-_march_1-_2022-v2.pdf
futr
So they haven't done a feasibility study YET?? WHAT??? I snorted my coffee when I read the PR today. Get with the program, guys.
Followers
|
34
|
Posters
|
|
Posts (Today)
|
0
|
Posts (Total)
|
648
|
Created
|
02/25/10
|
Type
|
Free
|
Moderators |
Volume | |
Day Range: | |
Bid Price | |
Ask Price | |
Last Trade Time: |