InvestorsHub Logo
Followers 155
Posts 5936
Boards Moderated 0
Alias Born 06/16/2004

Re: None

Monday, 06/11/2012 12:12:59 AM

Monday, June 11, 2012 12:12:59 AM

Post# of 97615
Through 2011 MSE was doing work here:

http://www.hanford.gov/page.cfm/324Building

http://www.washingtonclosure.com/documents/E1011025_2.pdf

MSE drilling crew was part of the 324 B-Cell Soil Sampling team that was nominated for an ALARA. Building 324 is the most complex and hazardous research facility being demolished along Hanford's river corridor. In 2009, contaminated grout was removed from the B-Cell sump and trench during preparations for demolition. A
visible breach was identified in the stainless steel liner of the sump in the lowest point of the hot cell floor. The line was located over 12' below grade and more than 40' in from the edge of the building. To gain access to the area, the maintenance
shop base pad on the north end of the building had to be removed and an access pit was excavated at the site of the shop. In 2009 through 2011, working with a Geoprobe, the MSE Team helped obtain soil samples in the difficult areas. "The team allowed for the smooth evolution of the physical soil samples needed from under
the B-Cell. Thanks to excellent teamwork, effective radiological planning, the entire evolution was conducted with no spread of contamination and all radiation exposures were less than planned. Their teamwork allowed workers' exposure to remain As Low As Reasonably Achievable!"

Winter 2012 Page 9
http://www.mse-ta.com/news/2012/ETEBA_winter_2012.pdf

ACQUISITION! M S E!
THE EVIDENCE WAS THERE FOR ANYONE TO SEE!

I LOVE MY DIVIDEND SHARES! lollol