InvestorsHub Logo
Followers 1083
Posts 109073
Boards Moderated 53
Alias Born 11/22/2003

Re: NYBob post# 51

Thursday, 03/22/2012 2:39:26 PM

Thursday, March 22, 2012 2:39:26 PM

Post# of 65
Timmins Projects | Alexo and Kelex





Canadian Arrow's Timmins Projects are comprised of its wholly owned past producing Alexo and Kelex deposits located 50 km east of Timmins, Ontario. The Company temporarily halted production due to low nickel prices in 2005 to review operating alternatives. Nickel prices have more than doubled since and attractive operating opportunities have recently developed that further enhance the deposits’ economics.

Between 2004 and 2005 the Company produced 30,138 tonnes of ore averaging 1.93% nickel containing 1.3M lbs of nickel from open pit mining of the Alexo and Kelex zones. At the time the only alternative for the Company was direct shipment of unprocessed ore about 350 km to the Xstrata Nickel Strathcona mill located near Sudbury, Ontario. The Company is currently reviewing economic alternatives to direct shipping that have developed in recent months.

The Alexo property is historically reported to have additionally produced 57,000 tons at 3.6% nickel for a total of 4.5M lbs of contained nickel.

The deposits are classified as Kambalda-style named after similar type-deposits occurring in Western Australia. The Alexo and Kelex deposits are composed of massive to semi-massive nickel sulphide accumulations inhabiting basal embayments along the footwalls of steeply dipping komatiitic ultramafic volcanic flows. The massive, semi-massive sulphides are overlain by stringer, net-textured, blebby and lower grade disseminated sulphide haloes extending upwards and away from the contact. The flows contact with intermediate volcanic country rocks. Other komatiitic hosted nickel sulphide deposits and occurrences in the area include the Redstone, McWatters, Hart, Langmuir 1 and 2, and Texmont.

A total 12,710 metres of drilling in 132 holes were completed in 2004-05 on the sulphide mineralization that extends off the known previous workings. The drilling was never completely evaluated for resource potential. An independent qualified consultant has been commissioned to complete NI 43-101 compliant mineral resource estimates on the deposits.

The project remains permitted. Infrastructure including water treatment facilities remain in place as do a closure plan and a closure bond.

To see a complete Timmins Projects presentation click here

Significant Alexo/Kelex Drill Results

Alexo Main:
Mineralization extending 200 metres beyond the Alexo mine workings to the east remains open and unexploited. Mineralization at Alexo Main is drilled on tight 15m section spacings and is continuous over 100m of strike east of the previous pit workings to section 1629E. Alexo is further enhanced by significant copper, cobalt, platinum and palladium values.

http://www.canadianarrowmines.com/cro/projects/alexo_kelex/


My opinions are my own and and DD I post should be confirmed as unbiased

Join InvestorsHub

Join the InvestorsHub Community

Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.