Wednesday, April 24, 2024 8:45:34 PM
12 04 2024
The Member of Parliament of Florina and Secretary of K.O. of the New Left, Petis Perkas, submitted a question to the Minister of Environment and Energy regarding the "Green HIPo" hydrogen project.
Peti Perka emphasizes that the hydrogen that will be produced should come exclusively from Renewable Energy Sources (green hydrogen) and the use of fossil fuels for its production will be excluded. The wording in the specification issue presented in the 6th Written Procedure of the Monitoring Committee of the Just Development Transition Program (JTPP) 2021-27 does not exclude the use of fossil fuels for the same purpose.
It is necessary to clarify on the one hand what will be the destination of the electricity produced by the hydrogen cells and on the other hand the compatibility of the design with the National Energy and Climate Plan (ESEK). For example, if he means that the electricity produced by the hydrogen cells will be used in electric cars, then there is a question of very low efficiency in the use of green hydrogen for electrification, which is not recommended.
The path of implementation of the PDAM, up to the present phase, is not consistent with the national strategy for the development of energy storage infrastructure as reflected in the ESEK, according to which there is a balance between three energy storage technologies (batteries, pumped storage and hydrogen). So far, two programs concerning hydrogen and none of the other storage technologies have been presented.
Taking into account the above, Peti Perka concludes with four questions to the competent Minister.
question by P. Perkas: "The Green HiPo project (hydrogen) is positive with reasonable questions that need to be answered"
Question
To the Minister of Environment and Energy
Topic: "Green HiPo (Hydrogen) Project Positive with Reasonable Questions Needing Answered"
In the 6th Written Procedure of the Monitoring Committee of the Just Development Transition Program (JTPP) 2021-27, the Green HiPo project was presented, which is part of a Project of Common European Interest in the field of hydrogen, which is initially positive. However, there are issues to be discussed and clarified as pointed out by the green tank [1] .
The hydrogen that will be produced should come exclusively from Renewable Energy Sources (green hydrogen) and the use of fossil fuels for its production will be excluded. The wording in the presented specification does not exclude the use of fossil fuels for the same purpose.
It is necessary to clarify on the one hand what will be the destination of the electricity produced by the hydrogen cells and on the other hand the compatibility of the design with the National Energy and Climate Plan (ESEK). For example, if he means that the electricity produced by the hydrogen cells will be used in electric cars, then there is a question of very low efficiency in the use of green hydrogen for electrification, which is not recommended.
There is no update on the location of the project and of course the Special Town Planning Plans (STP) of the Depolitization Zones (ZAP) have not been approved. In any case, the tendency to concentrate potential investments in the capital of the Region of Western Macedonia does not go hand in hand with the balanced development of the lignite regions of Kozani and Florina.
The path of implementation of the PDAM, up to the present phase, is not consistent with the national strategy for the development of energy storage infrastructure as reflected in the ESEK, according to which there is a balance between three energy storage technologies (batteries, pumped storage and hydrogen). So far, two programs concerning hydrogen and none of the other storage technologies have been presented.
Taking into account the above, the competent Minister is asked:
Will the hydrogen that will be produced come exclusively from Renewable Energy Sources (green hydrogen) or will it also be produced from the use of fossil fuels?
What will be the fate of the electricity produced by the hydrogen cells? Will it be used for example in electric cars?
Where will the project be located? Is the balanced development of the lignite areas ensured in a fair way?
Is the implementation path of the PDAM, up to the present phase, consistent with the national strategy for the development of energy storage infrastructure as reflected in the ESEK?
The questioning Member of Parliament
Theopisti (Peti) Perka
[1] https://thegreentank.gr/wp-content/uploads/2024/02/20240206_Comments_Green_Tank_6h_grapth_diadikasia.pdf
https://perkapeti-gr.translate.goog/erotisi-p-perka-quot-thetiko-me-eyloga-erotimata-poy-chrizoyn-apantisis-to-ergo-green-hipo-ydrogono-quot/?_x_tr_sl=el&_x_tr_tl=en&_x_tr_hl=en&_x_tr_pto=sc
Recent ADN News
- Advent Technologies Holdings Announces Effective Date of Reverse Stock Split • Business Wire • 05/09/2024 05:30:00 PM
- Advent Technologies Holdings Approves Reverse Stock Split • Business Wire • 05/01/2024 01:10:00 PM
- Advent Technologies Holdings Receives Nasdaq Notice on Late Filing of its Form 10-K • Business Wire • 04/23/2024 08:58:00 PM
- Advent Technologies Signs Strategic Joint Development Agreement with Siemens Energy to Expedite the Decarbonization of the Maritime Sector • Business Wire • 04/04/2024 12:00:00 PM
- Advent Technologies Participates in $12.4 Million Project to Reduce GHG Emissions in the Maritime Sector • Business Wire • 03/05/2024 01:15:00 PM
- Advent Technologies Receives Formal Invitation from Greek State for €24 Million Grant for the Green HiPo IPCEI Project • Business Wire • 02/26/2024 12:00:00 PM
- Form 4 - Statement of changes in beneficial ownership of securities • Edgar (US Regulatory) • 02/21/2024 12:30:48 AM
- Form 3 - Initial statement of beneficial ownership of securities • Edgar (US Regulatory) • 02/12/2024 08:52:44 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 01/25/2024 12:00:17 PM
- Form 8-K/A - Current report: [Amend] • Edgar (US Regulatory) • 01/17/2024 10:30:11 PM
- Advent Technologies Announces Appointment of Naiem Hussain as Chief Financial Officer • Business Wire • 01/11/2024 11:03:00 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 01/11/2024 10:17:12 PM
- Advent Technologies Secures Funding from Danish Energy Technology Development and Demonstration Program for Innovative R&D Project • Business Wire • 01/08/2024 01:35:00 PM
- Form 424B5 - Prospectus [Rule 424(b)(5)] • Edgar (US Regulatory) • 12/28/2023 10:20:45 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 12/27/2023 10:06:43 PM
- Form 424B5 - Prospectus [Rule 424(b)(5)] • Edgar (US Regulatory) • 12/27/2023 01:47:16 PM
- Advent Technologies Announces $2 Million Registered Direct Offering of Common Stock • Business Wire • 12/22/2023 01:44:00 PM
- Advent Technologies Launches Portable Clean Power Solution for Construction and EV Charging Applications • Business Wire • 12/20/2023 02:00:00 PM
- Advent Technologies Secures €1.8 Million Frame Contract with Volta Energy for the Supply of Methanol-Powered Fuel Cell Units • Business Wire • 12/18/2023 02:05:00 PM
- Advent Technologies Secures Additional New Contract worth $2.8 Million from U.S. Department of Defense for its Portable Fuel Cell System • Business Wire • 12/14/2023 02:00:00 PM
- Advent Technologies Granted 180-Day Extension by NASDAQ to Regain Compliance with Minimum Bid Requirement • Business Wire • 11/22/2023 06:14:00 PM
- Form 8-K - Current report • Edgar (US Regulatory) • 11/22/2023 04:41:40 PM
- Advent Technologies Receives Funding Update for €60 Million to Launch Green HiPo IPCEI Project • Business Wire • 11/16/2023 01:00:00 PM
- Advent Technologies Reports Q3 2023 Results • Business Wire • 11/14/2023 12:00:00 PM
- Advent Technologies Announces Date for Third Quarter 2023 Earnings Call • Business Wire • 11/07/2023 02:00:00 PM
Avant Technologies Engages Wired4Tech to Evaluate the Performance of Next Generation AI Server Technology • AVAI • May 23, 2024 8:00 AM
Branded Legacy, Inc. Unveils Collaboration with Celebrity Tattoo Artist Kat Tat for New Tattoo Aftercare Product • BLEG • May 22, 2024 8:30 AM
"Defo's Morning Briefing" Set to Debut for "GreenliteTV" • GRNL • May 21, 2024 2:28 PM
North Bay Resources Announces 50/50 JV at Fran Gold Project, British Columbia; Initiates NI 43-101 Resources Estimate and Bulk Sample • NBRI • May 21, 2024 9:07 AM
Greenlite Ventures Inks Deal to Acquire No Limit Technology • GRNL • May 17, 2024 3:00 PM
Music Licensing, Inc. (OTC: SONG) Subsidiary Pro Music Rights Secures Final Judgment of $114,081.30 USD, Demonstrating Strength of Licensing Agreements • SONGD • May 17, 2024 11:00 AM