InvestorsHub Logo
Followers 21
Posts 4543
Boards Moderated 0
Alias Born 04/19/2011

Re: None

Tuesday, 02/01/2022 7:14:36 PM

Tuesday, February 01, 2022 7:14:36 PM

Post# of 120
Metals Creek Drill Hole DL21-021 Delivers 5.14 g/t Gold Over 12.76 Meters, Including 8.55 g/t Gold Over 6.19 Meters at Dona Lake



Thunder Bay Ontario, February 01, 2022 - Metals Creek Resources Corp. (the “Company” or Metals Creek, TSXV: MEK, OTCQB: MCREF, FRA:M1C1) is pleased to announce diamond drill results for drill holes DL21-020A and DL21-021 from the phase III diamond drill program at the Dona Lake Gold project (See News Release November 08, 2021).

Drill hole DL21-021 intersected the Main Zone stratigraphy at approximately 465 meters(m) below surface and 15m below the lowermost mine working (455 Level) returning a core length intercept of 8.55 grammes per ton (g/t) gold (Au) over 6.19m (506.81 – 513.00m). This was a part of a broader zone of mineralization of 5.14 g/t Au over 12.76m (506.81 – 519.57m). (See Table 1 Significant Results). Mineralization is hosted within silicate-sulfide iron formation and characterized by stringer to disseminated pyrrhotite ranging from 3 to 25% with local pyrite. Alteration consists of moderate to strong hornblende, grunerite and occasional garnets. With an increase in alteration, primary banding within the iron formation has become more diffuse. The bottom portion of this unit sees an increase in magnetite content with associated amphiboles.

Read more at:
https://www.metalscreek.com/february-1-2022
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent MEK News