InvestorsHub Logo
Followers 170
Posts 22199
Boards Moderated 0
Alias Born 04/21/2006

Re: caedward post# 80568

Tuesday, 10/24/2017 9:11:41 PM

Tuesday, October 24, 2017 9:11:41 PM

Post# of 81315
Worse than that, high strength concrete ain't up the GPGC alley.

The power system needs to be redesigned and built to withstand future Category 5 storms. That means things like putting the power lines underground - the few underground lines weathered Maria quite well – and making poles that can’t be subsurface out of high-strength concrete.

https://www.forbes.com/sites/jamesconca/2017/10/13/puerto-rico-needs-50000-utility-poles/#57ff12ed3d84

You wouldn't be trying to put the shuck on me, would ya stranger?

As I often get told, step aside son, you're a blockin' the MOMO!