Re: Casing program...

The 30" conductor has been set...

The 20" surface casing has been set...

A 13 3/8" intermediate casing string has been set...

A 9 5/8" intermediate casing string has not yet been set...

A 5 1/2" production casing string will be set when the well has reached "total depth" and coring and logging runs have been completed...

Production casing sometimes doubles as production tubing, but usually production tubing is installed inside the production casing (to facilitate "workovers" in the future).

-Bliss