COPPERSTONE MINE - GEOTECHNICAL INVESTIGATIONS
Copperstone Mine. Tailing dam design and construction. Project manager and engineer in charge. Design and construction of a 50 acre tailings dam including embankment slope stability analysis and geotechnical sampling and testing. The dam is a HDPE geo-membrane double lined tailings storage facility with a sub-drain pipe network and a leak detection system. The project included a lined water recirculation pond (1 acre), construction oversight and approval of construction materials and field geotechnical testing



http://vidalecg.com/new-gallery-5/

http://vidalecg.com

This type of engineering at Copperstone was not cheap ... in 2014... Hmmm? imho