Fission Hits 61.09m total composite >10,000 cps with Metallurgical Drilling at R780E Zone Summer prefeasibility holes completed, including metallurgical and geotechnical drilling http://www.marketwired.com/press-release/fission-hits-6109m-total-composite-10000-cps-with-metallurgical-drilling-r780e-zone-tsx-fcu-2229986.htm KELOWNA, BRITISH COLUMBIA--(Marketwired - Aug. 14, 2017)