InvestorsHub Logo
Followers 1
Posts 16
Boards Moderated 0
Alias Born 04/17/2014

Re: None

Friday, 05/05/2017 10:00:58 AM

Friday, May 05, 2017 10:00:58 AM

Post# of 21090

not sure if this matters to us or not
updated 5/4/17 by Pacific Drilling


[color=red][color=red][/color][/color]Page 1 of 2
FLEET STATUS REPORT
NYSE: PACD
As of May 4, 2017
Updates noted in bold
Contract
Average Contract
Contractual Backlog Revenue Availability/
Water Depth Drilling Depth Start/Expected Dayrate Per Day Expected
Rig Name Delivery (ft) (ft) Customer Location Start Term (US$000's) (US$000's) Availability
Pacific Bora 2010 10,000 37,500 FASL Nigeria 9-Feb-2017 (1) 195 195 (1)
Erin Nigeria 15-July-2017 (2) 195 195 (2)
Pacific Scirocco 2011 12,000 40,000 Hyperdynamics In
Transit 30-May-2017 (3) 225 225 (3)
Pacific Mistral 2011 12,000 37,500 — Aruba — — — — Immediate
Pacific Santa
Ana 2011 12,000 40,000 Chevron USGoM 21-Mar-2012 4 years + 316 days 481 — 31-Jan-2017
— USGoM — — — — Immediate
Pacific Khamsin 2013 12,000 40,000 — Cyprus — — — — Immediate
Pacific Sharav 2014 12,000 40,000 Chevron USGoM 27-Aug-2014 5 years 551 605 Sep-19
Pacific Meltem 2014 12,000 40,000 — Aruba — — — — Immediate
(1) Folawiyo AJE Services Limited (“FASL”): two firm wells with one option well
(2) Erin Energy Corporation (“Erin”): one firm well with two option wells
(3) The Pacific Scirocco is in Côte d'Ivoire preparing for its contract with Hyperdynamics Corporation (“Hyperdynamics”) to operate in the Republic of Guinea for one firm well with three option wells.


http://s1.q4cdn.com/189426555/files/doc_downloads/FleetStatus/FSR_May_2017.pdf