$TURV GCP2 Windows and Water Investor Update 10/25/16 The windows have been assembled inside the greenhouse structure and installation onto the top of the structure has begun. This past week the 850 foot water pipeline was dug, installed, and subsequently passed preliminary inspections. Next week the pipeline will be finished and have a pressure tested.