$TURV GCP2 Concrete & Gutter Work Continues Investor Update 09/29/16 Construction crews are completing the concrete flooring. The orange hoses are for radiant heat, making for even more efficient climate control. Upper frame gutters continue to be installed. These gutters are located in the trough of each peak and collect water and melted snow.