InvestorsHub Logo
Followers 1318
Posts 26925
Boards Moderated 6
Alias Born 12/10/2012

Re: sidedraft post# 79767

Tuesday, 07/12/2016 2:02:49 PM

Tuesday, July 12, 2016 2:02:49 PM

Post# of 81315
IBM using Novacab TES system in Bromont, QC

Last checked, the system.... is still in service delivering operational cost savings.

Plant Contact......

Address: 23 Boulevard de l'Aéroport,
Bromont, QC J2L 1A3, Canada

Phone: +1 450-534-6953



***************************************************



Our products Inaugurated in 1972, the Bromont plant is the largest IBM semiconductor assembly and testing facility in the world. It is also the sole IBM plant in Canada. We assemble 200 types of products using 800 manufacturing processes. A new production batch enters the assembly line every three minutes in this state-of-the-art facility and a new part number is assigned every two hours. Around $500 million worth of products is exported annually.

https://intraweb.stockton.edu/eyos/energy_studies/content/docs/FINAL_PRESENTATIONS/7B-3.pdf


TES Implementation Implementation Results Results in:
– Reduction Reduction of the Peak Load
– Reduction Reduction of the Energy Consumption
– Simplification the Simplification the operation operation and the maintenance and the maintenance
• It Follows Follows loads from 100 tons to 2500 tons; 100 tons to 2500 tons;
• It Reduces Reduces the Stop and Start to a minimum
• It Reduces Reduces unefficient efficient part loads to the mechanical mechanical units and
corrects the original « corrects the original « Overdesign Overdesign »
– Chilled Chilled water supply more stable and more stable and safe
• In case of power In case of power shortage shortage or mechanical chanical failure failure, two pumps are sufficie sufficient
to operate operate the chilled water plant r plant
– Reduction Reduction in refrigera refrigerant needs (½ of the original design) (½ of the original design)
– Reduction Reduction in GHG emissions emissions by 45 %