InvestorsHub Logo
Followers 91
Posts 8838
Boards Moderated 0
Alias Born 07/27/2005

Re: xxxxcslewis post# 286744

Tuesday, 10/06/2015 6:57:16 PM

Tuesday, October 06, 2015 6:57:16 PM

Post# of 312015
Actually, that sounds like a regulation for the process which a report was due on 1/30/2014. Surprisingly, PTOI shut down operations before that
report was due. What a shock!
---------------
Compliance Demonstration shall include the following monitoring:
Monitoring Type: RECORD KEEPING/MAINTENANCE PROCEDURES
Monitoring Description:
Used Oil (Waste Oil) is to be co-fed along with the
plastic as a heat transfer media to assist in the melting
of the plastic.

The oil is to be fed as a maximum of 0.1
gallon per pound of plastic fed on a 1-hour average basis
.
Records of oil and plastic feed rates to each unit,
including a calculation of the hourly average feed ratio,
will be maintained onsite by the facility for three years.