InvestorsHub Logo
Followers 1080
Posts 106354
Boards Moderated 55
Alias Born 11/22/2003

Re: NYBob post# 753

Friday, 08/28/2015 11:45:36 AM

Friday, August 28, 2015 11:45:36 AM

Post# of 864
AuRico Metals Announces Extension of Higher Grade Mineralization at Kemess East -



https://ca.finance.yahoo.com/q?s=ami.to

https://ca.finance.yahoo.com/news/aurico-metals-announces-extension-higher-113000928.html

AMI.TO 0.73 +0.02


TORONTO, Aug. 18, 2015 /CNW/ - AuRico Metals Inc. (TSX:AMI.TO - News), ("AuRico" or the "Company") is pleased to announce the results of the first two holes drilled as part of the 2015 Exploration Program at the Kemess Project. The drill holes targeted the Kemess East Deposit, which is located one kilometer east of the previously delineated Kemess Underground deposit and 6.5 kilometres north of the Kemess Mill Facility.

Results of the Kemess East drilling include:

Hole KH-15-01 intersected 305 metres of 0.625 g/t Au and 0.433% Cu
Hole KH-15-02 intersected 301 metres of 0.466 g/t Au and 0.394% Cu
(The estimated true thickness of the mineralized intervals is 70% of the reported intercept length.)

(Refer to Table 1 for complete drilling results, Table 2 for Drill Collar Location and Figures 1-3 for Kemess Property Location Map, Plan Map and Cross-Section.)

Both holes have extended the higher grade core mineralization beyond what was identified in the 2013 and 2014 drill programs. Hole KH-15-01 extended mineralization 50m east of KH-13-08 and 80m east of KH-13-09 and 140m west of KH-14-08. Hole KH-15-02 extended mineralization 115m east of KH-14-03 and 110m south of KH-13-08. In both cases this higher grade mineralization is at the same elevation as that identified in the earlier drilling.

The Kemess East deposit remains open to the east towards the Kemess East Offset Fault and to the south towards the post mineralization Sovereign intrusion. "We're pleased with the early results from this year's Kemess drill campaign which is not only adding confidence to the inaugural Kemess East resource announced earlier this year but is also expanding the area of known mineralization. The results of the drilling are particularly encouraging given the immediate proximity to the existing processing facility and associated surface infrastructure that includes a 50,000 tonne per day mill, administration and camp facilities, permitted tailings storage and full access to grid power," stated Chris Richter, President and CEO of AuRico Metals.

Table 1: Drill Intercepts that Intersected the Kemess East Mineralized Deposit

2015 Exploration Program

The Company's 2015 exploration and geotechnical drilling program will continue to focus on the Kemess East delineation with four diamond drills, and is expected to continue to the end of September.

Kemess Underground Permitting Update

The Kemess Underground Project is currently undergoing a Substituted Environmental Assessment led by the British Columbia Environmental Assessment Office on behalf of both the province of British Columbia and the Canadian Environmental Assessment Agency (on behalf of the Federal Government of Canada). This review is currently in the pre-Application stage (the second of three phases) of the environmental assessment process and AuRico anticipates receiving the Application Information Requirements ("AIR") in September 2015, a key milestone in the environmental assessment process. The Environmental Application ("EA") will then be finalized in accordance with the AIR. Based on the current timeline it is expected that the EA will be submitted in early 2016. Once submitted, the EA undergoes a 30 day screening (in order to ascertain that the EA complies with certain information requirements) and if the EA is compliant with the AIR there is a 180 day review period during which time comments are received, addressed and incorporated into the Final Assessment Report. This is then delivered to both the provincial and federal ministers for their respective decisions. These decisions must be announced within 45 days.

Kemess Property Overview

The Kemess Property (See Figure 1) is located in north-central British Columbia, Canada, approximately 430 kilometres northwest of Prince George. The Kemess Underground Project is located approximately 5.5 kilometres north of the past producing Kemess South open pit mine that operated from 1998 to 2011 and produced 3 million ounces of gold and 749 million pounds of copper.

A Feasibility Study on the Kemess Underground Project was released on March 25, 2013 and proposes an underground block caving operation with average annual production of 105,000 ounces of gold and 44 million pounds of copper over a 12 year mine life.

Quality Control – Analyses and Sample Location

Exploration activities at Kemess are being conducted by AuRico personnel under the supervision of Wade Barnes Project Geologist and a Qualified Person as defined by National Instrument 43-101. Wade Barnes is PGeo registered with the Association of Professional Engineers and Geoscientists of British Columbia ("APEGBC") and has reviewed and approved this news release.

Samples were prepared at an on-site sample preparation lab. The prepared 250 g samples, crushed to 80% passing 10-mesh and pulverized to 85% passing 150-mesh, were shipped in security sealed pails to ALS Chemex Laboratory in North Vancouver for analysis. Samples were analyzed for a suite of 33 elements, including iron, molybdenum, and silver, using 4-acid digestion and ICP atomic emission spectroscopy on a one gram sub-sample. Significantly mineralized samples were additionally analyzed by an extra ore grade analysis for copper and molybdenum by ICP atomic emission spectroscopy, following a 4-acid digestion. Gold analyses were completed by standard 30g fire assay with an AA finish.

Quality control (QC) samples (blanks, duplicates, and certified reference materials) were inserted into the sample stream at regular intervals such that 2 in 25 (8%) samples were submitted for quality control purposes. QC sample performance was monitored on a regular basis, independently of the laboratories, and failures addressed in a timely manner. All sample batches were also subjected to each laboratory's internal quality control procedures, for an additional 40% QC sample volume.

About AuRico Metals

AuRico Metals is a mining royalty and development company whose cornerstone assets include a 1.5% NSR on the Young-Davidson Gold Mine, located in Ontario, Canada, a 2% NSR on the Fosterville Mine, located in Victoria, Australia, and 100% ownership of the advanced Kemess Project in British Columbia, Canada. AuRico Metals' goal is to deliver sustained value creation for the company's many stakeholders. AuRico Metals' head office is located in Toronto, Ontario, Canada.

Cautionary Statement


Table 2: Drill Collar Locations

Figure 1 - Kemess Property

Figure 2 - Kemess East Drill Hole Intercepts

Figure 3 - Kemess East Section Looking West

SOURCE AuRico Metals

PDF available at: http://stream1.newswire.ca/media/2015/08/18/20150818_C7918_PDF_EN_479420.pdf

PDF available at: http://stream1.newswire.ca/media/2015/08/18/20150818_C7918_PDF_EN_479415.pdf

PDF available at: http://stream1.newswire.ca/media/2015/08/18/20150818_C7918_PDF_EN_479311.pdf

PDF available at: http://stream1.newswire.ca/media/2015/08/18/20150818_C7918_PDF_EN_479313.pdf

PDF available at: http://stream1.newswire.ca/media/2015/08/18/20150818_C7918_PDF_EN_479315.pdf



Contact:
Chris Rockingham, Vice President, Development, AuRico Metals Inc., 416-216-2780, chris.rockingham@auricometals.ca; Chris Richter, President and Chief Executive Officer, AuRico Metals Inc., 416-216-2780, chris.richter@auricometals.ca

https://ca.finance.yahoo.com/q?s=ami.to

http://web.tmxmoney.com/quote.php?qm_symbol=AMI




God Bless


My opinions are my own and and DD I post should be confirmed as unbiased

Recent AMI News