Monday, April 27, 2015 10:58:22 PM
Maybe the trial was already 80%-90% complete before 1/1/2015
The release of the Annual Facility Report recently showed there was no feedstock besides plastic in 2014.
Of the pittance the plant even received or had was almost all was unusable and shitcanned.
And there was no waste oil even received at the facility .
That is one hell of a way to 90% complete a pilot.......LMFAO.
http://www.scribd.com/doc/260927937/2014-Annual-Facility-Report-JBI-re-1-s-facility-at-20-Iroquois-St-Niagara-Falls-NY
FEATURED Cannabix Technologies and Omega Laboratories Inc. Advance Marijuana Breathalyzer Technology - Dr. Bruce Goldberger to Present at Society of Forensic Toxicologists Conference • Sep 24, 2024 8:50 AM
FEATURED Integrated Ventures, Inc Announces Strategic Partnership For GLP-1 (Semaglutide) Procurement Through MedWell USA, LLC. • Sep 24, 2024 8:45 AM
Avant Technologies Accelerates Creation of AI-Powered Platform to Revolutionize Patient Care • AVAI • Sep 24, 2024 8:00 AM
VHAI - Vocodia Partners with Leading Political Super PACs to Revolutionize Fundraising Efforts • VHAI • Sep 19, 2024 11:48 AM
Dear Cashmere Group Holding Co. AKA Swifty Global Signs Binding Letter of Intent to be Acquired by Signing Day Sports • DRCR • Sep 19, 2024 10:26 AM
HealthLynked Launches Virtual Urgent Care Through Partnership with Lyric Health. • HLYK • Sep 19, 2024 8:00 AM