As for a change I really liked this commentary I read about the possible JV and remove the most profitable .. .. ++++ LBSR MOVING FORWARD little by little. Liberty Star announces that the Company’s CEO/Chief Geologist Jim Briscoe and Director (mining engineer-attorney) Brett Gross will host a three day visit including a two day site visit to the Hay Mountain Project area for a potential funder from the Arabian Peninsula who has signed a non-disclosure agreement. This trip is tentatively planned before Thanksgiving, dependent only on US entry visa and travel arrangements. Accompanying the two parties will be an independent geologist/porphyry copper expert hired by the guest as well as an arms- length Registered Professional Geologist (RPG) who is experienced in a particular (classic) porphyry copper skarn deposit in the SW USA, participated in intensive postgraduate study of porphyry copper skarn deposits and has used vegetation geochemistry like that used by Liberty Star at Hay Mountain (and supervised by our Technical Board Member – and Geochemist, Shea Clark Smith) and is familiar with distal halos of the Hay Mountain type skarn mineralization. In addition to the Hay Mountain Project area, the visit will include ASARCO’s Mission Mine and the Bisbee mining district, both of which are corollaries to Hay Mountain (exposed rather than covered). The tour will also include two other similar porphyry copper drilling projects and one small porphyry copper production facility with exploration potential. During the trip in this mineral rich area there will also be viewings of dormant porphyry copper, gold and silver mines, including Tombstone itself. These sites, all within a 60 mile radius of the Hay Mountain Project, will demonstrate and solidify the similarity of other large porphyry copper operations to the as yet undrilled Hay Mountain which lies hidden beneath shallow cover. The trip will take two days and a 3rd day is reserved for a second review of the technical details of the Hay Mountain data, and discussion of Joint Venture parameters.

3. The final Archaeological Assessment document has been finished by the Company’s contractor Antigua Archaeology LLC, and was submitted to the Arizona State Land Department (ASLD) for their final approval on November 5, 2014. No significant archaeological material was found and the report recommends approval of our proposal as written. According to the ASLD, response time is dependent on the length of the queue but should take place in 30 to 90 days. This is the final step in the long approval process. When ASLD final approval is received, Liberty Star is ready to drill as soon as funding is in place.by little......
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent LBSR News