InvestorsHub Logo
Followers 261
Posts 19732
Boards Moderated 0
Alias Born 10/03/2004

Re: drkazmd65 post# 87782

Wednesday, 04/16/2014 9:31:43 AM

Wednesday, April 16, 2014 9:31:43 AM

Post# of 146210
I guess scale-up for tox is complete and the GMP facility isn't needed to start. Let's see who kept saying this and who kept insisting differently?

The Company also reported that it is producing Injectable FluCide™, our most advanced drug candidate, at its existing facilities, in the large quantity needed for the Safety and Toxicology (“Tox Package”) study. The strong safety observed in preliminary safety studies resulted in requirement of a very large quantity for the Tox Package study. Notably, the drug candidate was found to be safe even at the maximum feasible dosage level in a small animal study. The Company reports that it has successfully scaled up the production of injectable FluCide at its current facility.

They serve beer Popsicles?

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent NNVC News