?Evaluation program began in May 2009 and will continue until May 2013 ?Two appraisal wells drilled in 2010; oil recovered from IP-5b well ?Independent lab analysis indicates an API gravity of ~ 9° to 10° ?Proprietary HTL process will enable pipeline transport and enhance the value of the heavy oil ?HTL synthetic crude oil is 16° API with a residual component of 16%; result is higher quality oil through cost effective upgrading ?190 sq km 2D seismic in the southern part of the block ?Deeper structures; potential lighter oil facilitates blending and enhances economics ?Currently drilling one exploratory well to test these deeper structures ?TD 9,500 ft.; results anticipated in third quarter 2012?Positive results could lead to reserve booking 24