snp is in a wonderful position to leverage the jdz properties to the eez. how? simple, stp desperately needs revenue, who can deliver rev by fast tracking the jdz production? snp so a little horse trading, eez priority in exchange for dramatic acceleration of jdz production just a thought
dat, I also thought of that, SNP could tie up the first five blocks allocated before any bidding. Get two from EEL, one from STP and two from us. The ibox only shows 17 blocks, most without sismic