Took a closer look at the U.S. Mag photo and it looks like at the time the picture was taken there was still some work to be done. The piping to the processing tanks still needs to be connected. As for the worker...he appears to be deep in prayer. That makes two of us.
Yes tom16, turn the switch on! that would be nice..Results from the 3 month testing should provide some proof that the IBAT DLE is what the results were before with SLR and the edGreg Mehros Group..Now even better with the new patented upgrades in equipment, that will produce 8 metric tons or more per year..soon to be much more..revenue..