The Processing Plant is capable of processing 240,000 tpa of ore. It'll now undergo "Factory Acceptance Testing" !.....(the final and important assembly "validation step" which simulatesand tests the end-to-end functional operation in a "controlled engineering environment")......
Once all the design specs and functions have been "verified"..... the Plant will be "containerized" and sent to....."the mine".