Hey Doc, "If they are tweaking the automated manufacturing process for Direct".
You posted something like this a while ago. I am pretty sure that in the last 10K they said they do have the DC mfg process for Direct automated, while they do not yet have the L process automated.
I hope, like many that for L, they have finished the process design and equipment build, and are at the stage of getting it approved. However, they definitely described Direct as being automated and L not, so... if not stating that the processes for Direct are approved means approval has not been granted, then both process are not approved, so that Direct being ahead of L must be in the actual process, not the approval. If that makes sense.
...assuming they need approval for a change in the mfg process for Direct. Maybe they don't need approval for that, being before starting phase 2. But still there might be safety concerns... so probably need approval...
But my main point being that in the 10K they claim to have finished the design and probably the build of the automated DC process for Direct.
I have only one foot in NWBO as I try to earn more $ to purchase $NWBO... so not in my interest to contribute much at this point.
Lost a leg in a death spiral... and now fighting a giant black widow for the last 9 months with a giant safety pin. (I have the safety pin, not the black widow.) And they both appear to be getting bigger all the time. So I am not going to say much more positive about NWBO.