Bishop Gold Mill (Not for viewing by dumbass shorts as the contents strains the brain and they cannot risk losing anymore)

The net value paid on the recent gold sale is equivalent to approximately $400 per ton. Further optimization of the gravity circuit along with the implementation of the flotation circuit are expected to increase recovery by up to 100% generating greater than 90% total recovery and a commensurate increase in value per ton to $800. In addition, ore control and head grade monitoring will be implemented as shipment sizes increase to give greater predictability and mass balance control at the Mill. Transportation costs for the recent 120 ton shipment from Fran was approximately $300 per ton which is expected to decrease to $200 per ton for all future shipments as a result of the recent opening of a new rail siding proximate to Fran. The siding was designed for ore on-loading from the nearby recently opened Blackwater Gold Mine and became operational on March 31, 2025. Milling costs are nominal at this time due to the low volume of ore being processed during optimization and ramp up. Direct operating cost is projected at $35 per ton or $3,500 per operating day at the rated mill capacity of 100 tons per day. Tariffs are expected to be $25 per ton or less due to the low value of the raw ore. Based on recent data, previous MET studies and head grade assays, target economics for the Mill is revenue of $800 per ton and costs of $300 per ton.

Seventy-five tons of ore is currently stockpiled at the Bishop Gold Mill. The ore will continue to be processed as part of optimization and ramp-up with additional shipments to follow. There is approximately 5,000 tons of stockpiled ore at the Project site. The main focus of optimization is now the flotation circuit. The Company has all necessary re-agents and has tested the mechanical aspects of the flotation circuit. The selective testing of the titration controls for frother and reagents is now underway. The implementation of the flotation circuit is expected to increase recovery by up to 100% from the current gravity only recovery, with overall recovery expected to reach 90%+. Independent metallurgical testing has resulted in a total recovery, inclusive of gravity and flotation circuits, of 97%. In addition, the Company has begun start-up of its concentrate drying circuit to reduce moisture content prior to refinery shipment.
Bullish
Bullish
Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent NBRI News