1 MW Container holds approximately 300 next generation BTC miners. A MW buildout can run 250,000-750,00 depending on equipment and contractors.

Equipped with approximately 300 S19 Pro miners – $2,850,000 - $3,250,000 (assuming $9500/miner, these prices change often)

Monthly managed OPEX cost – $34,560 (300 miners x .05 cents x 3.2kw x 24 hours x 30 days/month)

LMFA has the miners. Now has the 15MW operations (just have to swap out the current partners miners with their own once they vacate) it's safe to assume 3M times 15 = 45M facility which includes the miners.

I repeat.

$45,000,000

All miners paid in full. 15MW facility paid in full in January. The balance due is a fraction of cash and BTC on hand.

This is beyond dirt cheap.

500X the intrinsic value of BTCT. All smoke and mirrors over there. .0001/share inevitable with that one.