InvestorsHub Logo
Followers 21
Posts 4528
Boards Moderated 0
Alias Born 04/19/2011

Re: None

Wednesday, 03/03/2021 3:11:57 PM

Wednesday, March 03, 2021 3:11:57 PM

Post# of 366
Galleon Gold - 38,000 Meters Completed and the Drills Keep Turning

March 2, 2021

[[ From Resource World ]]

Results include multiple intercepts ranging from 5 g/t Au to 27 g/t Au

Galleon Gold Corp. (TSXV: GGO) (the “Company” or “Galleon Gold”) is pleased to provide an update on the ongoing drill program at its 100% owned West Cache Gold Project, Timmins, Ontario. The Company has completed 38,000 meters of drilling in 177 core holes and continues to return excellent drill results from across the project area.

Highlights from Central East Pit and the newly expanding area southward:

- WC-20-65 intersected
7.33 g/t Au over 1.5 m (103.5 to 105 m)
5.22 g/t Au over 1.5 m (244.5 to 246 m)
5.94 g/t Au over 1.0 m (270 to 271 m)
- WC-20-66 intersected 6.68 g/t Au over 1.5 m (409.5 to 411 m)
- WC-20-67 intersected 7.9 g/t Au over 1.0 m (130 to 131 m)
- WC-20-68 intersected
7.4 g/t Au over 1.0 m (175 to 176 m)
7.2 g/t Au over 1.0 m (315 to 316 m)
9.2 g/t Au over 1.0 m (322 to 323 m)
- WC-20-69 intersected 9.82 g/t Au over 1.5 m (252 to 253.5 m)
- WC-20-70 intersected 13.6 g/t Au over 1.0 m (216 to 217 m)
- WC-20-71 intersected 12.6 g/t Au over 1.5 m (174 to 175.5 m)
- WC-20-73 intersected 27.0 g/t Au over 1.0 m (235.5 to 236.5 m)
- WC-20-91 intersected 14.0 g/t Au over 1.5 m (119 to 120.5 m)

*Holes 65, 67, 68 and 69, (Figure 1) provide support for the East Pit area definition drilling. Holes and intercepts to the south; including 66, 70, 71, 73 and 91, are part of a previously untested mineralized area located south of the East Pit. Additional drilling is planned in this newly emerging southern area.

Highlights from New Zone #9:

WC-21-116 intersected 3.52 g/t Au over 7.0 m (69 to 76 m), including 6.26 g/t Au over 2.0 m.
WC-21-117 intersected 1.37 g/t Au over 17.5 m (67.5 to 85 m), including 2.49 g/t Au over 5.0 m.
WC-21-099 intersected 1.63 g/t Au over 7.0 m (94.5 to 101.5 m), including 4.09 g/t Au over 2.0 m.

*Holes 116, 117 and 99, (Figures 1 and 2) help define the near surface eastern edge of Zone #9 at potential open pit depths.

Highlights from the Gap Area:

WC-20-58 intersected 9.82 g/t Au over 1.5 m (244.5 to 246 m)
WC-20-61 intersected 5.05 g/t Au over 0.65 m (174 to 174.65 m); and 9.98 g/t Au over 1.5 m (209.5 to 211 m)



Read at:
https://resourceworld.com/galleon-gold-38000-meters-completed-and-the-drills-keep-turning/