InvestorsHub Logo
Followers 20
Posts 7168
Boards Moderated 0
Alias Born 03/02/2013

Re: None

Tuesday, 02/26/2019 7:12:47 AM

Tuesday, February 26, 2019 7:12:47 AM

Post# of 596
« ...Kerr Mines Metallurgical Test Work
2019-02-26 06:29:49 AM ET (GlobeNewswire)


Kerr Mines Inc. (TSX: KER, OTC: KERMF, FRA: 7AZ1) ("Kerr" or the "Company") is pleased to announce results of advanced metallurgical testing for the Copperstone Mine located in Arizona, USA. In addition, the Company will be participating in the 2019 Prospectors and Developers Association of Canada ("PDAC") annual conference.

Advanced Metallurgical Testing:

-- Achieved 97% gold recovery and lower reagent consumption;

-- Improved recoveries and lower reagent consumption are expected to significantly increase profitability life of mine;

-- Milling cost reduction of US$2.00 to US$2.50 per ton compared to the previously published 2018 Preliminary Feasibility Study;

-- Enables detailed design of the gold ore leach and dore production circuits;

-- Compliments previously announced receipt of the state air permit modification which authorizes construction of the new gold ore leach and dore production circuits (see press release February 5, 2019).

Parameter 2018 PFS Results February 2019 Results Gold recovery to dore 95% 97% Gold Leach Cyanide Consumption 2.0 kg/tonne milled 1.5 to 2.0 kg/tonne milled Reagent Consumption for Destruction of Residual Cyanide in Tailings 0.56 US$/tonne milled 0.77 to 0.99 US$/tonne milled Carbon Consumption 0.5 kg/tonne milled 0.05 to 0.1 kg/tonne milled
"These metallurgical testing results confirm and further enhance the economics of the Copperstone Mine, as previously published in 2018," said Martin Kostuik, President. "Stronger gold recoveries and lower consumption costs will further increase profitability and returns for our stakeholders. As we continue to work towards mine life extension, these results will add considerable value to the Copperstone Mine. Having achieved this important milestone, we will strive to further de-risk and advance the Copperstone Mine towards production. "

Sulfidization-Acidification-Recycle-Thickening ("SART") Test Work:

-- Test work complete and results pending;

-- Purpose is to evaluate the economic viability of incorporating a SART circuit to the planned new gold ore leach processing plant.

-- The SART circuit can further reduce operating costs by reducing reagent consumption and can add revenue through the recovery of copper from the gold ore.

About Kerr Mines Inc.

Kerr Mines is an Emerging American Gold Producer currently advancing the 100% owned, fully permitted past-producing Copperstone Mine project to production. Copperstone is a high-grade gold project located along a detachment fault mineral belt in mining-friendly Arizona. This gold project in Arizona demonstrates tremendous exploration potential targeting multi-million ounce prospects within a 4,775 hectare (11,800 acres) land package.

The technical information in this news release has been prepared in accordance with the Canadian regulatory requirements set out in NI 43-101 and reviewed and approved by Jeffery Choquette, P.E. of Hard Rock Consulting, LLC., MMSA QP member, who is a "Qualified Person" as defined by NI 43-101 for this project.

*Kerr Mines National Instrument 43-101 Technical Report dated April 11, 2018: Preliminary Feasibility Study for the Copperstone Project, La Paz County, Arizona, USA

PDF Version of 43-101 technical report available: http://kerrmines.com/wp-content/uploads/KerrCopperstone_PFS_43-101.pdf

YouTube: Copperstone Gold Mine KER:TSX 3 min. Investor Tour Video

For further information contact:

Claudio Ciavarella

Chief Executive Officer

cciavarella@kerrmines.com

416-855-9305 ... »


Read more at https://stockhouse.com/companies/bullboard/t.ker/kerr-mines-inc?postid=29412853#wFD7zFJoGHu8wuP8.99

https://www.juniorminingnetwork.com/junior-miner-news/press-releases/kerr-mines/58694-kerr-mines-achieves-97-gold-recovery-from-metallurgical-test-work.html
Recent KER News