krays many thanks. Could you please comment on this as I am a little confused here:

NYISO Transmission Expansion and Interconnection Manual June 2017

Attachment E. Steps in the NYISO Small Generator Interconnection Process14
(Applicable to Generating Facilities up to 20 MW)
(Revised 06/15/2017)

http://www.nyiso.com/public/webdocs/markets_operations/documents/Manuals_and_Guides/Manuals/Planning/tei_mnl.pdf

+++++++++++++++++++
In searching around to understand "status categories (NYISO)," to better understand your post, based on MW size and different interconnection points, the two LIPA projects in themselves (13.9MW & 18.5MW) would be "Small Generator" rather than "Large Generator" according to the NYISO Interconnection Manual--unless LIPA here is viewed as a whole? Am I missing something that makes them "Large Generator"?

Small Generator has less steps and would shorten the time frame for execution, wouldn't it, and possibly qualify for "fast track"?