InvestorsHub Logo
Followers 51
Posts 4142
Boards Moderated 1
Alias Born 07/11/2009

Re: None

Thursday, 11/19/2015 1:00:43 PM

Thursday, November 19, 2015 1:00:43 PM

Post# of 165851
A couple bits of info at this link i hadnt seen before.


"Figure 12 Proposed open pit mine design with block model
of niobium mineralization in perspective view
The pit concept extends to a depth of 240 m with 20 m benches and 5 m
berms. The pit wall slope is approximately 50 ° (Figure 13).
One 10 m wide ramp is shown in this plan, with a gradient of 10 °.
However, for safety considerations a second ramp is strongly
recommended for contingency measures."

http://www.canada-resources.ie/index.php/investor-relations/2-uncategorised/10-first-pdf