Thursday, November 19, 2015 1:00:43 PM
"Figure 12 Proposed open pit mine design with block model
of niobium mineralization in perspective view
The pit concept extends to a depth of 240 m with 20 m benches and 5 m
berms. The pit wall slope is approximately 50 ° (Figure 13).
One 10 m wide ramp is shown in this plan, with a gradient of 10 °.
However, for safety considerations a second ramp is strongly
recommended for contingency measures."
http://www.canada-resources.ie/index.php/investor-relations/2-uncategorised/10-first-pdf
FEATURED Cannabix Technologies to Present Marijuana Breathalyzer Technology at International Association for Chemical Testing (IACT) Conference in California • Apr 22, 2024 8:49 AM
BestGrowthStocks.com Issues Comprehensive Analysis of Triller Merger with AGBA Group Holding Limited • AGBA • Apr 22, 2024 1:00 PM
Kona Gold Beverages, Inc. Prepares for First Production Run Set to Launch May 17, 2024 • KGKG • Apr 22, 2024 8:30 AM
VPR Brands LP Reports Record Annual Financial Performance for Fiscal Year 2023 • VPRB • Apr 19, 2024 11:24 AM
Coinllectibles' Subsidiary, Grand Town Development Limited, Acquires Rare Song Dynasty Ceramics Worth Over USD28million • COSG • Apr 18, 2024 8:03 AM
ILUS Provides Form 10-K Filing Update • ILUS • Apr 17, 2024 9:54 AM