InvestorsHub Logo
Followers 63
Posts 3724
Boards Moderated 0
Alias Born 03/27/2007

Re: uksausage post# 151

Monday, 09/19/2022 11:53:20 AM

Monday, September 19, 2022 11:53:20 AM

Post# of 194
All i can come up with. Engineering for the 240 kW demonstration is currently underway, with construction expected to begin in late 2023 and power-on expected in early 2024.
https://www.sciencedirect.com/science/article/abs/pii/S0360319921030846

Wind-powered 250 kW electrolyzer for dynamic hydrogen production: A pilot study
Author links open overlay panelChangZhangJinyiWangZhiboRenZhiyongYuPengjieWang

https://www.energy.gov/eere/fuelcells/articles/us-hydrogen-electrolyzer-locations-and-capacity

Never buy or sell based on my post. You know the saying ( My Opinion )
(Life's journey is not to arrive at the grave safely in a well-preserved body, but to skid in sideways, totally worn-out, shouting, 'HOLY SHIT! WHAT A RIDE!')

Volume:
Day Range:
Bid:
Ask:
Last Trade Time:
Total Trades:
  • 1D
  • 1M
  • 3M
  • 6M
  • 1Y
  • 5Y
Recent BE News