InvestorsHub Logo
Followers 16
Posts 6768
Boards Moderated 1
Alias Born 06/06/2007

Re: howestreetbull post# 404

Wednesday, 04/26/2017 10:43:06 AM

Wednesday, April 26, 2017 10:43:06 AM

Post# of 465
BGMZF BGM Intersects 13.63 g/t Au over 14.55 Metres at Shaft Zone
by @newswire on April 26, 2017
Mosquito Creek Expands to Depth

TORONTO, April 26, 2017 /CNW/ - Barkerville Gold Mines Ltd. (TSXV: BGM) (the "Company" or "Barkerville") is pleased to announce a new discovery from the ongoing 130,000 metre Phase II Island Mountain exploration drilling program at the Company's flagship Cariboo Gold Project. The Company is currently exploring and delineating the Valley Zone with four drill rigs. Detailed drilling results, a drill hole location plan map, level plan and longitudinal section are presented at the end of this release.

Island Mountain Drillhole Location Map (CNW Group/Barkerville Gold Mines Ltd.)

New Veining Intersected at Depth at Mosquito Creek

Located at a vertical depth of 280 metres below surface, drillhole IM-17-081 intersected a new veining occurrence averaging 23.31 g/t Au over 7.80 metres. This veining occurs in the largely untested area between the former Aurum and Mosquito Creek Mines. Further downhole, at a vertical depth of 400 metres below surface, a second vein set grading 7.43 g/t Au over 2.00 metres was also intersected. Because of the lack of drilling at this depth, these two occurrences are open for expansion.

Shaft Zone Expands

Drillhole IM-17-085 has intersected series of veins averaging 13.63 g/t Au over 14.55 metres at a vertical depth of 250 metres below surface in the Shaft Zone. This intersection occurs 45 metres along vein strike of previously reported drillhole IM-17-036 which graded 16.96 g/t Au over 5.15 metres hosted in an analogous vein set. Again, this new occurrence is open for expansion in all directions.

The geometry and hence true width of these mineralized intercepts cannot be assuredly concluded at this time based on the information available.

"Our pragmatic and disciplined exploration approach of drill testing the Shaft and Mosquito Creek Zones on aggressively spaced 100 metre drill centres to determine the extents of the mineralized system is consistently generating new zones of veining on Island Mountain", remarked Paul Geddes, P.Geo. the Company's Vice President Exploration. "Guided by our technical teams geological understanding of the controls on mineralization at the Cariboo Gold Project, our success rate has increased dramatically and we are eager to begin an infill drilling program on these new targets while still advancing the target pipeline with aggressively spaced exploratory drilling in this large gold system."

About the Phase II Program

The 130,000 metre 2017 Phase II exploratory and delineation drill program on Island Mountain is intended to determine the extent of the vein systems that were historically never explored, and is aimed at discovering new vein systems and sulphide replacement bodies that will ultimately inform a maiden resource at Island Mountain. Seven drill rigs are currently operating on Island Mountain, with an eighth rig testing for additional mineralization below the former Aurum and Cariboo Gold Quartz Mines which have never been explored since mining operations ceased circa 1960.

Qualified Persons

Exploration activities at the Cariboo Gold Project are administered on site by the Company's Exploration Manager, Maggie Layman, P.Geo. As per National Instrument 43-101 Standards of Disclosure for Mineral Projects, Paul Geddes, P.Geo. Vice President Exploration, is the Qualified Person for the Company and has prepared, validated and approved the technical and scientific content of this news release. The Company strictly adheres to CIM Best Practices Guidelines in conducting, documenting, and reporting its exploration activities on the Cariboo Gold Project.

Quality Assurance – Quality Control

Once received from the drill and processed, all drill core samples are sawn in half, labelled and bagged. The remaining drill core is subsequently stored on site at the Company's secure facility in Wells, BC. Numbered security tags are applied to lab shipments for chain of custody requirements. The Company inserts quality control (QC) samples at regular intervals in the sample stream, including blanks and reference materials with all sample shipments to monitor laboratory performance. The QAQC program was designed and approved by Lynda Bloom, P.Geo. of Analytical Solutions Ltd., and is overseen by the Company's Qualified Person, Paul Geddes, P.Geo, Vice President Exploration.

Drill core samples are submitted to ALS Geochemistry's analytical facility in North Vancouver, British Columbia for preparation and analysis. The ALS facility is accredited to the ISO/IEC 17025 standard for gold assays and all analytical methods include quality control materials at set frequencies with established data acceptance criteria. The entire sample is crushed and 250 grams is pulverized. Analysis for gold is by 50g fire assay fusion with atomic absorption (AAS) finish with a lower limit of 0.01 ppm and upper limit of 100 ppm. Samples with gold assays greater than 100 ppm are re-analyzed using a 1,000g screen metallic fire assay. A selected number of samples are also analyzed using a 48 multi-elemental geochemical package by a 4-acid digestion, followed by Inductively Coupled Plasma Atomic Emission Spectroscopy (ICP-AES) and Inductively Coupled Plasma Mass Spectroscopy (ICP-MS).

About Barkerville Gold Mines Ltd.
The Company is focused on developing its extensive land package located in the historical Cariboo Mining District of central British Columbia. Barkerville's mineral tenures cover 1,164 square kilometres along a strike length of 60 kilometres which includes several past producing hard rock mines of the historic Barkerville Gold Mining Camp near the town of Wells, British Columbia. The QR Project, located approximately 110 kilometres by highway and all weather road from Wells was acquired by Barkerville in 2010 and boasts a fully permitted 900 tonne/day gold milling and tailings facility. Test mining of the Bonanza Ledge open pit was completed in March of 2015 with 91,489 tonnes of ore milled producing 25,464 ounces of gold. The Company has completed a number of drilling and exploration programs over the past 20 years and is currently compiling this data with all historical information in order develop geologic models which will assist new management and provide the framework to continue to explore the Cariboo Gold Project. An extensive drill program is currently underway with the goal of delineating additional high grade gold mineralization.

Cautionary Statement on Forward-Looking Information
Neither the TSX Venture Exchange ('TSXV') nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this release. No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. This news release contains forward-looking information which is not comprised of historical facts. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward looking information in this news release includes, but is not limited to, the Company's objectives, goals or future plans, statements regarding exploration results and exploration plans. Factors that could cause actual results to differ materially from such forward-looking information include, but are not limited to, capital and operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in obtaining or failures to obtain required governmental, environmental or other project approvals, uncertainties relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, fluctuations in commodity prices, delays in the development of projects and the other risks involved in the mineral exploration and development industry, and those risks set out in the Company's public documents filed on SEDAR. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Table 1: Length weighted gold composites for Island Mountain Phase II drillholes:

HOLE-ID
FROM (M)
TO (M)
CORE LENGTH (M)
AU (G/T)
AREA
IM-17-079
29.85
30.70
0.85
8.89
MC
IM-17-079
249.40
249.95
0.55
5.65
MC
IM-17-080
148.00
152.30
4.30
4.82
MC
INCL
151.20
151.75
0.55
20.20
MC
IM-17-081
175.30
176.30
1.00
10.90
MC
IM-17-081
257.50
258.00
0.50
28.10
MC
IM-17-081
283.70
291.50
7.80
23.31
MC
INCL
283.70
284.50
0.80
10.15
MC
AND
286.10
287.60
1.50
25.40
MC
AND
287.60
288.50
0.90
18.25
MC
AND
288.50
289.50
1.00
55.70
MC
AND
289.50
290.15
0.65
31.50
MC
AND
290.15
291.00
0.85
48.20
MC
IM-17-081
402.50
404.50
2.00
7.43
MC
IM-17-082
113.00
113.50
0.50
47.60
SHAFT
IM-17-082
139.60
140.15
0.55
6.03
SHAFT
IM-17-082
178.85
183.10
4.25
5.60
SHAFT
INCL
179.90
180.90
1.00
14.80
SHAFT
IM-17-082
200.30
200.80
0.50
21.10
SHAFT
IM-17-082
209.20
209.70
0.50
28.00
SHAFT
IM-17-082
297.60
298.80
1.20
5.56
SHAFT
IM-17-083
20.65
21.15
0.50
11.30
SHAFT
IM-17-083
216.10
216.60
0.50
8.28
SHAFT
IM-17-083
221.65
229.25
7.60
5.78
SHAFT
INCL
221.65
222.30
0.65
21.90
SHAFT
AND
223.50
224.00
0.50
18.05
SHAFT
AND
228.75
229.25
0.50
29.90
SHAFT
IM-17-084



NSA
MC
IM-17-085
291.60
292.30
0.70
21.40
SHAFT
IM-17-085
366.45
381.00
14.55
13.63
SHAFT
INCL
367.40
368.45
1.05
32.60
SHAFT
AND
369.70
370.20
0.50
26.80
SHAFT
AND
377.00
377.85
0.85
155.00
SHAFT
AND
378.65
379.15
0.50
10.55
SHAFT


True widths cannot be accurately determined from the information available therefore core lengths are reported. Rock not recovered by drilling was assigned zero grade. Top cuts have not been applied to high grade assays. MC = Mosquito Creek, SHAFT = Shaft Zone.

Table 2: Drillhole Collar Orientations:

HOLE-ID
AZIMUTH
DIP
IM-17-079
136.90
-45.20
IM-17-081
139.20
-66.30
IM-17-083
137.30
-41.40
IM-17-080
138.60
-45.30
IM-17-082
142.40
-45.00
IM-17-084
136.60
-45.90
IM-17-085
139.20
-64.30



Island Mountain Level Plan - 1,040m Elevation Shaft Zone (CNW Group/Barkerville Gold Mines Ltd.)

Island Mountain Vertical Longitudinal Section (CNW Group/Barkerville Gold Mines Ltd.)

SOURCE Barkerville Gold Mines Ltd.


View original content with multimedia: http://www.newswire.ca/en/releases/archive/April2017/26/c7484.html

Join the InvestorsHub Community

Register for free to join our community of investors and share your ideas. You will also get access to streaming quotes, interactive charts, trades, portfolio, live options flow and more tools.